Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0525-00990
Parcel: 12401010A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0525-00990
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/31/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/31/2025 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
1. Provide sealed plans for approval. IBC 107.2.1
2. Update list of special inspections to include foundation steel placement, masonry to go with field welding. IBC 107.2.1
Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
07/15/2025 Commercial Mechanical Standard REQUIRES RESUBMIT 1. The current mechanical specifications still refer to wall-mounted A/C units as well as cassette-mounted heat pumps. [Initial comment: Clarify the description of the indoor mechanical units. The mechanical specifications call for heat pumps with wall-mounted ductless indoor units but the mechanical plan shows AC with ceiling-mounted cassettes. Reference: Section 107.2.1, IBC 2018.]
2. The ventilation calculations appear to be based on 3 occupants not 10 and do not include ventilation for the corridor. [Initial comment: Show the ventilation calculations for the bedrooms and “other spaces” (e.g. corridors and common areas. Reference: Section 403.3.2, IMC 2018.]
3. A new COMcheck certificate has not been submitted. [Initial comment: The COMcheck Mechanical Compliance Certificate is based on a single package heat pump, not the proposed HVAC equipment. Provide a COMcheck Mechanical Compliance Certificate that is based on the proposed HVAC equipment.
4. Provide sealed drawings.
5. Detail 2/M2.0 does not apply to this activity.
07/11/2025 PDSD Application Completeness Express REVIEW COMPLETED