Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0525-00981
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/04/2025 | Site Zoning Standard | APPROVED | |||
| 06/05/2025 | Water - PDSD Standard | APPROVED | |||
| 05/21/2025 | Fire New Construction Standard | NOT REQUIRED | |||
| 05/22/2025 | Outdoor Lighting Standard | NOT REQUIRED | |||
| 06/09/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 06/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/03/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please amend plans to show the walls separating dwelling units in the same building, walls separating sleeping units in the same building and walls separating dwellings are constructed as fire partitions in accordance with IBC Section 708. These walls should have a 1-hour fire-resistance rating. IBC 420.2 2. Please amend the plans to show the required 1-hour fire-resistive rating for the shaft enclosure, as indicated by IBC 713.2 and IBC 707 and IBC 711. 3. Please amend the plans where fire-resistance wall separation is required, amend plans to indicate the existing fire-rating of the partition wall or provide new and cross-reference assembly detail. For new 1-hour fire-rated assemblies, provide construction details with basis of approval by one of the following: A. Listing number approved by third-party testing agency (i.e., UL, GA) B. Item number for prescriptive fire-resistive assembly under IBC Table 721.1(2) C. Prescriptive assembly constructed under IBC 722.6. 4. Please amend the plans to note or otherwise indicate the penetrations of non-fire-resistance-rated floor or floor/ceiling assemblies shall be filled to resist the free passage of flame and the products of combustion with an approved noncombustible material or with a fill, void or cavity material that is tested and classified for use in through-penetration firestop systems. IBC 714.6 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/22/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | TC-COM-0525-00981 (1510 E 9TH ST BLDG B TUCSON, AZ 85719), TC-COM-0525-00982 (1510 E 9TH ST BLDG C TUCSON, AZ 85719), TC-COM-0525-00983 (1510 E 9TH ST BLDG D TUCSON, AZ 85719) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Show two or more 2O AMP small appliance circuits at the kitchen countertop receptacle outlets; they may also serve the breakfast room and dining room, but not other locations, [210.52(C)(1)] and [210.52(B)(1)]. GFCI protected, [210.8(A)]. REF Circuit 7. 2. Show Bathroom receptacles with a separate 20 AMP dedicated circuit, [210.11(C)(3)] and [210.52(D)]. REF Circuit 7. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 06/05/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Verify that maintenance access is provided for the water heater and the fan coil unit per Section 306.1, IMC 2018 (e.g., can the water heater be replaced without removing the fan coil unit or the stacked washer/dryer). 2. Provide ventilation for dwelling units in R-2 occupancies three-stories and less per Section 403.3.2.1 through 403.3.2.5, IMC 2018. |
||
| 06/05/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Verify the location of the proposed indirect waste receptor is visible for inspection and has ready access for cleaning. Reference: Section 802.4, IPC 2018. 2. Show that the floor drain used as an indirect receptor for water heater drain pan is capable of accepting the maximum discharge and is designed to prevent splashing or flooding. Reference: Section 802.4.1, IPC 2018. 3. Show the size and termination of the condensate drain from the fan coil unit. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. |
||
| 05/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |