Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0525-00957
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/02/2025 | Commercial Building Standard | APPROVED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 7/1/2025 10:27:21 PM Building(B) Reviewer (from previous submittal TUC9716001.051525) Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/22/2025 12:56:43 PM |
||
| 07/02/2025 | Commercial Electrical Standard | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 6/28/2025 6:53:35 PM |
||
| 07/02/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/02/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 7/1/2025 6:24:11 PM 1. (RESOLVED) - General - Provide existing RTU Schedule. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. 2. (RESOLVED) - General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements. 3. (RESOLVED) - General - Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space. 4. (UNRESOLVED) - General - Provide Heat Load Calculations - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads i. As per the Load calculations on plan sheet M601 the total coil load required is 213.9 MBH. The existing unit schedule state with AHU 1, 2, and 3 the total coil load provided is 172 MBH. Existing systems do not meet the required cooling needed for the space. |
||
| 07/02/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 6/29/2025 2:28:48 PM SECOND PLUMBING REVIEW: COMMENT 1 REMAINS UN-RESOLVED-1). PLAN PAGE P100: MISSING PLUMBING FIXTURE MANUFACTURER NAMES & MODEL NUMBERS. ADD MANUFACTURER NAMES & MODEL NUMBERS. TO THE FIXTURE SCHEDULE. -2018 IPC 303 ** INFO NOT ADDED TO PLANS AND OR SPEC MANUAL NOT PROVIDED** RESOLVED-2). PLAN PAGE P100 OR P101: MISSING SPECIFIC TYPE OF INDIVIDUAL BEVERAGE EQUPMENT BACKFLOWS. ADD SPECIFIC TYPE OF INDIVIDUAL BEVERAGE EQUPMENT BACKFLOW DEVICES TO BE USED AT EACH APPLIANCE . -2018 IPC 608.17.1 RESOLVED-3). PLAN PAGE I401: MISSING LAVATORY SIDE WALL CLEARANCE. ADD MISSING LAVATORY SIDE WALL CLEARANCE. -2018 IPC 405.3.1 |
||
| 06/25/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |