Permit Number: TC-COM-0525-00957
Parcel: 12109367A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0525-00957
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2025 Site Engineering Standard APPROVED Site improvements for this area per approved site revision 11 must be completed prior to final inspection/CofO approval.
06/05/2025 Site Zoning Standard APPROVED Site improvements per approved site revision 11 must be completed prior to final inspection/CofO approval.
06/05/2025 Water - PDSD Standard APPROVED
05/23/2025 Outdoor Lighting Standard NOT REQUIRED Signage under separate permit.
06/12/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/28/2025 Commercial Building Standard REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 5/26/2025 1:20:00 AM
1. General / Comment response narrative: For project updates, please provide a written response to each comment;
updates without a clear response may not be reviewed. If you have any questions regarding the comments, you may
contact me directly. Updates may result in additional comments.
2. Sheets A003, A004 & A005 / Foundation design required: The Architectural Site Details include the following note at
multiple locations: "Site-specific footing engineering required by licensed engineer". Drawings cannot be approved for
permit without a foundation design sealed by a registered design professional. Please provide a site-specific footing
design per the note by the Architect.
3. Sheet A201 / Key Notes #9 & 12 / Deferred submittals: Key notes #9 and 12 on Sheet A201 reference a roof-mounted
RTU screen and a pre-fabricated steel canopy to be provided by the landlord. Please confirm that it is the intention of
the Architect of Record for these items to be submitted as deferred submittals. Note that IBC Section 107.3.4.1
requires deferred submittals to be approved by the building official. The IBC further requires the following procedure
be followed when permitting deferred submittals:
i. All submittals shall first be reviewed by design professional in responsible charge.
ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of
the building.
iii. They shall then be submitted for review by the building official.
iv. No structural elements shall be installed until approved by building official.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 5/22/2025 12:56:43 PM
05/28/2025 Commercial Electrical Standard REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 5/23/2025 9:54:24 AM
1. E102 ENLARGED POWER AND SYSTEMS PLANS: Wiring for 6-30R receptacles and Clover brewer (14-50R)
shared with receptacle circuits shall provide conduit size (to assure conduit fill is not exceeded) and ground conductor
size. Conductors shall be derated as required per NEC table 310.15(B)(3)(a). Shared conductors (of various sizes) in
raceway as (#8,#12,#8) is not explicit enough for a typical electrical contractor without more instruction.
2. E601 PANEL SCHEDULES AND ONE-LINE DIAGRAM: Comment only. Should relocate some load i.e. the 8 KW 3
phase Oven from Panel A (loaded to 98% capacity) to the more lightly loaded panel B (55% capacity).
05/28/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 5/28/2025 4:04:14 PM
1. General - Provide existing RTU Schedule. - 2018 IECC Section C103.2Information on construction documents. - 2018
IBC Section [A]107.2.1Information on construction documents.
2. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is
acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements.
3. General - Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate
compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load,
minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space.
4. General - Provide Heat Load Calculations - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads
05/28/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 5/26/2025 3:33:37 PM
FIRST PLUMBING REVIEW:
1). PLAN PAGE P100: MISSING PLUMBING FIXTURE MANUFACTURER NAMES & MODEL NUMBERS. ADD
MANUFACTURER NAMES & MODEL NUMBERS. TO THE FIXTURE SCHEDULE. -2018 IPC 303
2). PLAN PAGE P100 OR P101: MISSING SPECIFIC TYPE OF INDIVIDUAL BEVERAGE EQUPMENT BACKFLOWS. ADD
SPECIFIC TYPE OF INDIVIDUAL BEVERAGE EQUPMENT BACKFLOW DEVICES TO BE USED AT EACH APPLIANCE . -
2018 IPC 608.17.1
3). PLAN PAGE I401: MISSING LAVATORY SIDE WALL CLEARANCE. ADD MISSING LAVATORY SIDE WALL
CLEARANCE. -2018 IPC 405.3.1
05/27/2025 Fire New Construction Standard REVIEW COMPLETED Carbon Dioxide systems requires an operational permit from City of Tucson Fire Department.
Fire extinguishers shall comply with Section 906 of the 2024 IFC.
05/14/2025 PDSD Application Completeness Express REVIEW COMPLETED