Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0525-00957
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/12/2025 | Site Engineering Standard | APPROVED | Site improvements for this area per approved site revision 11 must be completed prior to final inspection/CofO approval. | ||
| 06/05/2025 | Site Zoning Standard | APPROVED | Site improvements per approved site revision 11 must be completed prior to final inspection/CofO approval. | ||
| 06/05/2025 | Water - PDSD Standard | APPROVED | |||
| 05/23/2025 | Outdoor Lighting Standard | NOT REQUIRED | Signage under separate permit. | ||
| 06/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/28/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 5/26/2025 1:20:00 AM 1. General / Comment response narrative: For project updates, please provide a written response to each comment; updates without a clear response may not be reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments. 2. Sheets A003, A004 & A005 / Foundation design required: The Architectural Site Details include the following note at multiple locations: "Site-specific footing engineering required by licensed engineer". Drawings cannot be approved for permit without a foundation design sealed by a registered design professional. Please provide a site-specific footing design per the note by the Architect. 3. Sheet A201 / Key Notes #9 & 12 / Deferred submittals: Key notes #9 and 12 on Sheet A201 reference a roof-mounted RTU screen and a pre-fabricated steel canopy to be provided by the landlord. Please confirm that it is the intention of the Architect of Record for these items to be submitted as deferred submittals. Note that IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. The IBC further requires the following procedure be followed when permitting deferred submittals: i. All submittals shall first be reviewed by design professional in responsible charge. ii. Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. iii. They shall then be submitted for review by the building official. iv. No structural elements shall be installed until approved by building official. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/22/2025 12:56:43 PM |
||
| 05/28/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 5/23/2025 9:54:24 AM 1. E102 ENLARGED POWER AND SYSTEMS PLANS: Wiring for 6-30R receptacles and Clover brewer (14-50R) shared with receptacle circuits shall provide conduit size (to assure conduit fill is not exceeded) and ground conductor size. Conductors shall be derated as required per NEC table 310.15(B)(3)(a). Shared conductors (of various sizes) in raceway as (#8,#12,#8) is not explicit enough for a typical electrical contractor without more instruction. 2. E601 PANEL SCHEDULES AND ONE-LINE DIAGRAM: Comment only. Should relocate some load i.e. the 8 KW 3 phase Oven from Panel A (loaded to 98% capacity) to the more lightly loaded panel B (55% capacity). |
||
| 05/28/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 5/28/2025 4:04:14 PM 1. General - Provide existing RTU Schedule. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. 2. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements. 3. General - Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space. 4. General - Provide Heat Load Calculations - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads |
||
| 05/28/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 5/26/2025 3:33:37 PM FIRST PLUMBING REVIEW: 1). PLAN PAGE P100: MISSING PLUMBING FIXTURE MANUFACTURER NAMES & MODEL NUMBERS. ADD MANUFACTURER NAMES & MODEL NUMBERS. TO THE FIXTURE SCHEDULE. -2018 IPC 303 2). PLAN PAGE P100 OR P101: MISSING SPECIFIC TYPE OF INDIVIDUAL BEVERAGE EQUPMENT BACKFLOWS. ADD SPECIFIC TYPE OF INDIVIDUAL BEVERAGE EQUPMENT BACKFLOW DEVICES TO BE USED AT EACH APPLIANCE . - 2018 IPC 608.17.1 3). PLAN PAGE I401: MISSING LAVATORY SIDE WALL CLEARANCE. ADD MISSING LAVATORY SIDE WALL CLEARANCE. -2018 IPC 405.3.1 |
||
| 05/27/2025 | Fire New Construction Standard | REVIEW COMPLETED | Carbon Dioxide systems requires an operational permit from City of Tucson Fire Department. Fire extinguishers shall comply with Section 906 of the 2024 IFC. |
||
| 05/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |