Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0525-00954
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/29/2025 | Commercial Building | NOT REQUIRED | |||
| 05/30/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/15/2025 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0525-00954 (2 E NAVAJO RD Unit:UNIT 1 TUCSON, AZ 85705) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf 2. Provided plans must include all required repair work and other unpermitted work noted in the code violation Case: CE-VIO0624-02164. ‘There is electric work done without permits to include AC units installed with new electrical ran to them on the north and south side of the home.’ Also include any electrical repair work required due to the fire. 3. Provide an electrical plan showing any/all electrical work. Include an electrical floor plan showing the location of all new electrical work. Plans shall include, but may not be limited to items below: 4. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300 and 408.4. 5. Provide new and updated panel schedules, showing the circuits that are being modified, added or removed. NEC arts;300 and 408.4. 6. Designate the circuit number, that corresponds to the panel schedule, at the location of each new or modified light fixture, receptacle, and equipment disconnect switch, NEC arts;300 and 408.4. 7. Provide electrical load calculations, for the Main Service Panel, Per NEC 220.40. 8. Provide an electrical riser diagram, 2017 NEC 230.9. Notate the grounding and bonding method, 2017 NEC 250.20(B), 250.24, 250.30(A)(4). Metallic gas lines must be bonded and not be used as the primary grounding method, 2017 NEC 250.50, 250.52(B)(1). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 05/29/2025 | Commercial Mechanical | REQUIRES RESUBMIT | Code Violations: 'There is electric work done without permits to include AC units installed with new electrical ran to them on the north and south side of the home. ' Provide a mechanical design along with heating/cooling load calculations performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Reference: Sections 107.1 and 107.2.1, IBC 2018. |
||
| 05/30/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-0525-00954 2 E. Navajo Rd. Unit 1 Tucson, AZ 85705 Install a 100A all in one panel (1st Review) TRANSMITTAL DATE: 5/30/2025 This site is located in the R-3 zone (Unified Development Code (UDC) Article 4.7.12). Multifamily is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Site zoning was unable to conduct a complete review with the plans submitted. Please submit a site plan that contains the information as noted in the sample plot plan. https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/residential_plot_plan_requirements.pdf 2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 05/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |