Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0525-00903
Parcel: 117032060

Address:
733 N 10TH AV

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0525-00903
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/26/2026 Fire New Construction Standard NOT REQUIRED
01/26/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/26/2026 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please contact me if you have any questions about the below comments.
I can be reached at email mark.masek@tucsonaz.gov
1. Please submit the complete plan set on your next submittal as only the Site plan was submitted this time.
Please contact me if you have any questions about the above comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
01/06/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0525-00903 (733 N 10TH AV TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Only one sheet, ‘SP-1’, was provided. Please provide the complete plan set, including all electrical work.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
01/23/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0525-00903
ADDRESS/PARCEL: 733 N 10TH AV TUCSON, AZ 85705

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:
1. Only the site plan was submitted. Please provide a complete plan set showing all mechanical and plumbing work. Reference: Section 107.2.1, IBC 2018.
01/23/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0525-00903
ADDRESS/PARCEL: 733 N 10TH AV TUCSON, AZ 85705

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:
1. Only the site plan was submitted. Please provide a complete plan set showing all mechanical and plumbing work. Reference: Section 107.2.1, IBC 2018.
01/06/2026 Outdoor Lighting Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0525-00903 (733 N 10TH AV TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Only one sheet, ‘SP-1’, was provided. Please provide the complete plan set, including all electrical work.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
01/23/2026 Site Engineering Standard REQUIRES RESUBMIT Permit: TC-COM-0525-00903
Location: 733 N 10TH AV
Review Date: 1/23/2026

Site Engineering Comments:
1. The plan set has a sheet index, but the file appears to be a single sheet. Resubmit full plan set. Site Engineering is unable to review this building permit TC-COM-0525-00903 with the submitted plans.

If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
01/23/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
TC-COM-0525-00903
733 N. 10th Ave. Tucson, AZ 85705
Renovation Addressing Stop Work Order (1st Review)

TRANSMITTAL DATE: 1/23/2026

Comment: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed.

This site is located in the R-3 zone (UDC 4.7.12). Multifamily is a permitted use in this zone (UDC Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6.

1. Comment: Site zoning is unable to conduct a complete review as only 1 sheet was provided however the Sheet Index refers to 6 sheets. Please resubmit and include all of the sheets so a complete review can be conducted.
2. Comment: Additional comments may be forthcoming based on responses to zoning comments and plans submitted.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
01/23/2026 Water - PDSD Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0525-00903
ADDRESS/PARCEL: 733 N 10TH AV TUCSON, AZ 85705

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:
1. Only the site plan was submitted. Please provide a complete plan set showing all mechanical and plumbing work. Reference: Section 107.2.1, IBC 2018.
01/02/2026 PDSD Application Completeness Express REVIEW COMPLETED