Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0524-01012
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/01/2024 | Commercial Mechanical | APPROVED | |||
06/26/2024 | Commercial Structural | APPROVED | |||
07/01/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
07/01/2024 | Commercial Electrical | REQUIRES RESUBMIT | The project address on the plans does not correlate with the address on the application information. Please clarify. |
||
07/01/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Clarify the installation of the hose bibbs, P7, on the domestic water riser they are shown being supplied with hot water (typo?). 2. Clarify the specification for the water fountain. Only one water fountain (electric water cooler) is shown on the plumbing fixture schedule, the upper level water plan appears to show either two fixtures or a dual unit but the description in the plumbing fixture schedule is ambiguous. Provide the number of drinking fountains that complies with the requirements of Sections 2902.1 and 2902.5, IBC 2018 and Section 410.3, IPC 2018. 3. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 4. Provide tempered water for the public restroom lavatory using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018. 5. Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018. |
||
06/25/2024 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
06/20/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0524-01012 - TD-DEV-0524-00155 2800 N PARK AV. – I-1 Valvoline gas station (1st Review) TRANSMITTAL: June 20, 2024 This site is located in the I-1 zone (UDC 4.7.8) General Merchandise Sales: Excluding Large Retail Establishments is a permitted use in this zone (Table 4.8-5), subject to Use Specific Standard 4.9.13.Q. 1. The address, 2800 N. Park Ave., this plan was submitted under is not correct and needs to be changed to the correct address, 2920 S Park Ave. 2. As development package (DP), TD-DEV-0524-00155, has not completed its first review Zoning cannot review the building plans for compliance with the DP. Zoning will review the building plans on the next submitted as long as the DP has completed its first review. 3. Until the DP is approved by all review agencies Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
07/01/2024 | Water - PDSD | REQUIRES RESUBMIT | Coordinate the water service to the building. The civil plan, 5 of 11, calls for a 2” water meter and a 1-1/2” RP backflow preventer but the pressure loss calculations (P-1.2), call out a 1” water meter and a 1-1/4” RP backflow preventer. | ||
06/09/2024 | Fire New Construction | REVIEW COMPLETED | |||
05/30/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |