Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0524-00983
Parcel: 128010040

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-0524-00983
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/14/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
10/14/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer (from previous submittal TUC9562001.052824)
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 6/11/2024 8:18:20 PM






Building(B) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved with Comments
Reason:
Date Completed : 10/11/2024 4:39:54 PM
Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel, or alter applicable codes or ordinances. The plan review and permit issuance shall not
be considered a warranty or guarantee. The registered design professional is responsible for following ALL applicable Federal, State, and local Municipal Codes and Ordinances.









Mechanical(M) Reviewer (from previous submittal TUC9562001.052824)
Jorge Valido
jvalido@safebuilt.com
Approved with Comments
Reason:
Date Completed : 6/10/2024 11:50:54 AM
1. General - This review is for Shell Build. Specific Tennant Buildouts will require new permits with new reviews.






Electrical(E) Reviewer (from previous submittal TUC9562001.052824)
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 5/30/2024 10:26:40 AM
1. E0.1 SYMBOL LEGENDS, NOTES, INDEX : Electrical Sheet index has two duplicate E2.1 sheets listed.
2. E2.1 ELECTRICAL HVAC FLOOR PLAN – NORTH: Could not locate Keyed Notes 2 and 10.
3. E4.1 ELECTRICAL ONE-LINE DIAGRAM: Could not locate Keyed Note #8






Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 10/13/2024 6:02:10 PM
Third Plumbing Review: Comment #2 still not addressed
Resolved-1). General: Need to address building plan review comment #9- 2018 IPC 1101.2
Un-resolved-2). Plan page P2.0: Plan page is missing a gas appliance detail that correctly depicts the shut off valve & sediment trap piping arrangement. Add a gas appliance connection in accordance with -2018 IFGC 408.4 ((sediment trap can't be installed on the horizontal run as shown on gas riser)
10/10/2024 PDSD Application Completeness REVIEW COMPLETED