Permit Number: TC-COM-0524-00878
Parcel: 132131320

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.2

Permit Number - TC-COM-0524-00878
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2024 Commercial Building APPROVED
05/23/2024 Site Zoning APPROVED
05/28/2024 Water - PDSD APPROVED
05/23/2024 Site Engineering NOT REQUIRED
05/29/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
05/24/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 Verify the rating and indicate the OCPD in the existing electrical service assigned for the new panel ā€˜Cā€™.

2 Indicate the Available Fault current at the service, 45KVA Transformers, and AIC ratings for all the Panels downstream.

3 Provide complete load calculations for the service and each panel in amps as well as KVA.

4 Show the location of the existing electrical service.

Ref; 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements.
05/29/2024 Commercial Mechanical REQUIRES RESUBMIT Verify that the proposed HVAC system is able to accommodate the thermal load of the conveyor oven or install a Type II hood over the oven. Reference: Sections 507.1, 507.2, and 507.3, IMC 2018.
05/28/2024 Commercial Plumbing REQUIRES RESUBMIT Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-0A.
05/13/2024 Fire New Construction REVIEW COMPLETED
05/10/2024 PDSD Application Completeness REVIEW COMPLETED