Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0523-01409
Parcel: 13624228D

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0523-01409
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/20/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/20/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 Ref; Plan sheet E-2.

(a)Why do the scope of work state, “INSTALL 7 NEW CHARGERS” ? The line diagram shows 6 EV charging stations. Is the 20 -amp branch circuit #6 identified as ‘GW’ also a charger? Provide a description of ‘GW’ in the symbol legend.

(b)Include in the line diagram and panel schedule how the Energy Management is tied into the system and identify each component.

(c)Provide a panel schedule for the 200 amp house panel including load calculations.

(d)The total load for panel ‘EV’ is shown at 64 amps. Why is feeder and OCPD for this panel only rated at 60 amps?

(e)Why is panel ‘EV’ a 40 -circuit panel? What is to prevent future loads to be added to this panel, thus overloading the designed sub-panel supply circuit?

(f)The line diagram shows 2- ‘EV-5’ Chargers. Please revise.

(g)Indicate the conduit and conductor sizes and types for the new ‘EV’ panel feeders.

Ref; 2018 IBC section 107.2.1, 2017 NEC.
05/31/2023 PDSD Application Completeness Express REVIEW COMPLETED