Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0523-01350
Parcel: 11518007F

Address:
1415 N 14TH AV

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0523-01350
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/26/2023 Commercial Building APPROVED
06/26/2023 Commercial Plumbing APPROVED
06/08/2023 Site Engineering APPROVED
06/27/2023 Site Zoning APPROVED
06/26/2023 Water - PDSD APPROVED
06/27/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/26/2023 Commercial Electrical REQUIRES RESUBMIT Please address the following electrical plan review comments. Also provide a written response.
Provide plans and evidence on the plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements.
1 Provide site lighting plans with the following information on the plans;
(a) Provide a complete luminaire schedule.
(b) Full compliance with sections 104.2.1(1), (2), (3).
3 See table 401.1, lighting area and option and indicate this information in the lighting site plan, also showing the locations and types of all exterior luminaires including existing.
4 402.1 (light source color temperature requirements), shielding requirements, etc .
5 Provide calcs for total lumens allowed and total lumens proposed per acre including existing, for Full Cut Off and Unshielded per table 401.1.
6 Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2.
7 Specify any exceptions used.
8 Curfew lighting controls If applicable.
9 Provide complete compliance with the 2018 IECC for the exterior lighting if applicable.
Do not confuse the Outdoor Lighting Code with the IECC.
Ref; 2017 NEC, 2012 Tucson/Pima County Outdoor Lighting Code (OLC), 2018 IBC sec 107.2.1. 2018 IECC.
05/30/2023 Fire New Construction REVIEW COMPLETED
05/24/2023 PDSD Application Completeness Express REVIEW COMPLETED