Review Date Reviewer's Name Type of Review Description Status Comments
10/09/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
09/14/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 6/6/2023 10:05:20 AM
1. No Geotechnical Report for the proposed buildings per International Building Code 2018, Section 1803.1 is not provided. The Inspector to verify ALL Geotechnical Information used on this Project.
2. NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.




Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 6/2/2023 4:46:22 PM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 5/23/2023 5:29:41 PM
Approved/subject to field approval




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 6/5/2023 9:06:28 AM
Electrical Review
By: Ron Ross PE
E6.0: Comment only: Lumen calculations for the two pole mounted fixtures do not appear to be calculated/on.



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 9/13/2023 8:25:27 PM
Second Plumbing Review: Documents uploaded for re-review don't correlate to the
TC-COM-0523-01312 Fuel center project 1). Unresolved-Lavatory faucet on plan page P-1 needs to be automatic type Per Tucson plumbing code amendments
09/28/2023 Site Engineering REQUIRES RESUBMIT 1. The layout of the site plan does not match the approved plans in DP21-0179. Please resubmit with plans that match the approved site plan.

Lianne Evans
lianne.evans@tucsonaz.gov
10/09/2023 Site Zoning REQUIRES RESUBMIT FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: TC-COM-0523-01312
4733 S CAMPBELL AV Zoning C-2

TRANSMITTAL DATE:‎October 9, 2023


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1.COMMENT Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the Development Package.

2. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. See engineering comment.

If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
09/13/2023 PDSD Application Completeness REVIEW COMPLETED