Permit Number: TC-COM-0523-01304
Parcel: 131100330

Address:
5502 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0523-01304
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/05/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/06/2023 Site Engineering REQUIRES RESUBMIT 1. The scope of work for this project will require a Development Package with site review.
2. The propose trash enclosure will require waste stream calculations on the Development Package. Also, according to recent clarification from Environmental Services, per TSM section 8-01, although recycling service isn’t required the site does need to provide at minimum the enclosure space for both solid waste and recycling. So, a single enclosure won’t be sufficient (without a TSMR and ES approval) and a double enclosure or an additional single enclosure will be needed to meet this requirement. It is also important to point out per TSM section 8-01.4.I - required parking may be reduced for existing development when solid waste and recycle enclosures are provided.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
06/06/2023 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0523-01304
5502 E. 22nd St. – C-1
Renovation of Existing Gas Station & Site Work (1st Review)

TRANSMITTAL: June 06, 2023

Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in C-1 Zone (UDC 4.7.20). General Merchandise Sales, excluding Large Retail Establishment, is an allowed use in the zone, (UDC Table 4.8-4), subject to Use Specific Standard 4.9.9.B.3 and 4.9.13.O.

1. Per Stephen Blood, PDSD Civil Engineer the addition of the dumpster addition requires a Development Package (DP). Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://cms3.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
10/05/2023 External Reviewers - Stantec REVIEW COMPLETED
05/31/2023 Fire New Construction REVIEW COMPLETED
05/24/2023 PDSD Application Completeness Express REVIEW COMPLETED