Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0523-01298
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/06/2023 | Site Engineering | APPROVED | |||
| 06/06/2023 | Site Zoning | APPROVED | |||
| 06/09/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/09/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0523-01298 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 6/9/2023 3:59:16 AM 1. Indicate the location of any structural members that are damaged and will need to be replaced on the plans. Key note details 7 and 8 indicate to inspect all members and replace where water damaged. This work is to be included in the permit submittal. Building(B) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 6/9/2023 3:57:20 AM 1. Please be advised, the drawings are missing information required to do a complete review. Additional comments may be required once all the information is provided. 2. Verify the tenant use for the finished combined space. The site plan notes indicate a real estate office, but the plans indicate the existing tenant is a barber shop. 3. Indicate on the drawings the applicable codes for the project as adopted and amended by the City of Tucson. ◦ 2018 International Building Code ◦ 2018 International Fire Code ◦ 2018 International Plumbing Code ◦ 2018 International Mechanical Code ◦ 2017 National Electrical Code ◦ ICC A117.1- 2009 ◦ City of Tucson/ Pima County Outdoor Lighting Code 4. Provide a life safety/ exit plan on the drawings that indicates the travel distances from the most remote points as well as the occupant loads for all the areas in accordance with 2018 IBC 1004 and 1017.2. Include the existing space 101 to the north since this will be a single tenant and no longer two separate areas. 5. Clarify which doors will have locking hardware and coordinate with the life safety plan. It appears that the from exit will go through the existing office 1 and the back door is in office 6. 6. The code analysis indicates the tenant area as being 3550 sf however it appears the two units are being combined for a total area of closer to 5000 sf, with the area of renovation being the 3550 sf. Update the drawings to include the total occupancy for the new combined space. 7. Indicate the buildings existing height and area in the code analysis on the drawings in accordance with 2018 IBC sections 503 and 504. 8. Clarify site plan note 7 on sheet A1 that indicates to remove the attached building. Indicate if this is a shed or a habitable addition, and if the demolition will require the removal of the roof, CMU walls, foundation, slab, electrical, mechanical and any plumbing. 9. Clarify if there is still a patio cover on the east side of the building or if it has been removed. 10. Indicate any work to be done in suite 101 to accommodate the new door opening on the floor plans. 11. Floor plan note 19 indicates to verify that a new 2x4 wall will enclose the existing plumbing. Since this is a critical dimension for the restrooms, verify the dimension or indicate a deeper wall on the drawings, this should not be left for verification in the field. 12. Floor plan note 25 on the floor plan is shown to be pointing to the back door but also a dashed wall. Clarify if this is an existing CMU bearing wall that is to be removed. Provide details for the support of the existing roof as part of the structural submittal. 13. Indicate any infill that is required for the roof from the removal of the existing mechanical systems. 14. Provide a reflected ceiling plan for the renovated area indicating the ceiling finishes. Section key note 9 indicates there are existing R38 batts and black vapor barrier installed below and secured to the framing that is to remain. It is unknown if this will be left exposed or if this area will receive a finished ceiling. 15. Indicate on the drawings that all interior finishes will be in accordance with 2018 IBC.803.1. 16. Provide elevation for the sink and countertop area adjacent to the bathrooms that appears to be a small break area. show the required heights and accessible clearances in accordance with ICC A117.1. 17. Indicate on the drawings that fire extinguishers shall be installed in accordance with 2018 IFC section 906.2. Mechanical(M) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 6/9/2023 3:58:08 AM 1. Provide a roof plan indicating the location of the new units and their approximate distance to the roof edge. It appears that the new unit above office 3 may be within 10 feet of the roof edge. If so, indicate how fall protection will be provided in accordance with the IMC and 2018 IBC 1015.6. Electrical(E) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 6/9/2023 3:57:43 AM 1. The electrical plan indicates the existing back light fixture is being replaced with a two-lamp flood light. Indicate this new fixture will be fully shielded as required per the outdoor lighting requirements and will be an EM fixture with a battery backup. 2. Indicate the location of an existing emergency light on the exterior at the front door or indicate new fixtures will be provided. 2018 IBC 1008.3.2 (5). 3. Indicate the location of the existing “night lighting” for the front office 1 on the plans for egress illumination or indicate light sensors will be used. 2018 IBC 1008.2. 4. Clarify if the new timeclock is to be installed in the restroom per note 5. If so indicate if this will affect the accessibility requirements of the door. 5. Indicate the location of an outlet on the roof that is within 25’ for the new HVAC unit above office 3, only an outlet in the back portion was found. Plumbing(P) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 6/9/2023 3:58:49 AM 1. Indicate on the drawings that all plumbing fixtures will be low flow type in accordance with the City of Tucson Ordinance 7178. 2. The new rough-in for the sinks in the offices indicates the sinks will be connected to the water supply from the existing tenant 101 space. Provide water fixture counts and calculations for this service. 3. Indicate the location of the existing water and sewer services on the site plan or provide a separate plumbing site plan. |
||
| 05/31/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 05/25/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |