Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0523-01247
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/02/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/02/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 6/2/2023 5:02:36 PM BUILDING INSPECTOR TO VERIFY THE GEOTECHNICAL REPORT AS STATED BELOW ON THE SITE BEFORE APPROVAL TO THE PROJECT. 1. Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 2. NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 8/1/2023 11:05:26 AM Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Denied Reason: Date Completed : 7/27/2023 9:48:09 PM 1. Provide detail showing how you are running your HVAC ductwork in relation to the fire rated floor/ceiling assembly sheet M2.1 (IMC2018,106.3.1) Complied 2. Provide ventilation calculations (IMC2018,403.3.1.1.1) Not Complied (MMC2018,403.3) 3. Provide mechanical ventilation to each unit sheet M1.1 (IMC2018,401.2) Not Complied same as #2 4. Bathroom exhaust in all units that penetrates the membrane of the fire rated floor/ceiling assembly shall be protected in an approved manner sheet M1.1 (IMC2018,607.6.2) Complied 5. Dryer duct that penetrates the fire rated floor/ceiling assembly in all unit's shall be protected in an approved manner sheet M1.1 (IMC2018,607.6.2) Complied Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 7/25/2023 4:17:37 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 7/29/2023 3:17:18 PM Second Plumbing Review: 1). OK 2). OK |
||
| 07/21/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |