Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0523-01240
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/11/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | TC-COM-0423-01167, TC-COM-0523-01240, TC-COM-0523-01241, TC-COM-0523-01242 SHARE PLANS Studio Session 829-086-124 On (TC-COM-0423-01167) |
||
| 07/11/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0423-01167 991 W MELROSE ST - LEASING OFFICE TC-COM-0523-01240 991 W MELROSE ST - BLDG A/5 UNIT TC-COM-0523-01241 991 W MELROSE ST - BLDG B/4 UNIT TC-COM-0523-01242 991 W MELROSE ST - BLDG C/5 UNIT GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 5/31/2023 4:51:38 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 6/26/2023 3:52:45 PM Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Denied Reason: Date Completed : 6/26/2023 10:53:23 PM 1. Where bathroom, dryer, kitchen exhaust duct's and outdoor fresh air duct penetrates the fire rated floor/ceiling assembly it shall be protected in an approved manner in accordance with this section in all apartment unit's (IMC2018,607.6.2) The section in voolation is 607.6.2 not 607.5.3 as is your response Not Complied 2. Provide ceiling radiation dampers at all ceiling supply diffuser's, provide the symbol on the plan and note it on the same page in all apartment unit's (IMC2018,607.6.2) Same as #1 Not Complied 3. Only fire dampers and ceiling radiation dampers labeled for use in dynamic systems shall be installed in HVAC systems designed to operate with fans on during a fire event in all apartment units (IMC2018,607.3.1) Not Complied 4. Provide kitchen exhaust to building D IMC2018,403.3) Complied 5. Provide make up air for laundry room approximately equal the the total dryer exhaust rate in an approved manner (IFGC2018,614.5) Complied Electrical(E) Reviewer Matthew Payette mpayette@safebuilt.com Approved Reason: Date Completed : 7/10/2023 3:47:57 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Conditionally Approved Reason: Date Completed : 6/26/2023 10:43:43 PM Second plumbing Review:**OK SUBJECT TO FIELD INSPECTIONS.** 1). OK - Roof parapet wall on plan pages A1.14, A1.24, A1.34, A1.42 needs secondary scuppers compliant with IPC 1106.5 & 1108, ** Secondary scupper detailed added to each page** 2). OK 3). OK 4). OK- Plan set submittal needs to be accompanied by the civil site utility piping plan for the continuation & correlation of the water, storm & sewer. -IPC 106.3.1 ** PER ARCHITECT RESPONSE COMMENTS, THIS CIVIL SET SET IS NOT PART OF THIS APPROVAL PACKAGE AND HAS ALREADY BEEN APPROVED BY TUCSON** **OK SUBJECT TO FIELD INSPECTIONS.** 5). OK 6). OK |
||
| 07/05/2023 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 06/28/2023 | Site Zoning | REQUIRES RESUBMIT | TC-COM-0423-01167, TC-COM-0523-01240, TC-COM-0523-01241, TC-COM-0523-01242 SHARE PLANS Studio Session 829-086-124 On (TC-COM-0423-01167) FROM: PDSD Zoning Review Section PROJECT: TC-COM-0423-01167 – Leasing Office, TC-COM-0523-01240 – Bldg A, TC-COM-0523-01241 – Bldg B & TC-COM-0523-01242 – Bldg C 8411 S. Houghton Rd – R-2 Multifamily (2nd Review) TRANSMITTAL DATE: June 28, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the R-2 zone (UDC 4.7.9). Multifamily is a permitted use in the zone, (Table 4.8-2), subject to Use Specific Standards 4.9.7.B.6, .9, & .10. 1. COMMENT: Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0123-00111 and although it appears that the plans match until the DP is approved by all review agencies Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 06/23/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |