Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0523-01231
Parcel: 13305054N

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0523-01231
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/14/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/14/2023 Commercial Structural REQUIRES RESUBMIT Please respond to the following:
1. Is Electric Power or any utility connected to these shipping containers. If so please provide drawing depicting this condition.
2. For each container, specify exactly what they are being used for.
3. Please resubmit.
05/25/2023 Site Engineering REQUIRES RESUBMIT See Zoning Comment
05/24/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-0523-01231
8725 E. Speedway Bl. - C-1
Religious Use – Addition of 4 Storage Containers to Site (1st Review)

TRANSMITTAL DATE: ‎May 24, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the C-1 zone (UDC 4.7.20). A Religious Use is a permitted use in this zone (Table 4.8-4). See Use-Specific Standards 4.9.13.O.
1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://cms3.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf. Zoning cannot approve this building permit until the DP is submitted and approved.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
05/13/2023 Fire New Construction REVIEW COMPLETED
05/11/2023 PDSD Application Completeness Express REVIEW COMPLETED