Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0523-01183
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/01/2023 | Site Engineering | APPROVED | |||
| 06/01/2023 | Site Zoning | APPROVED | |||
| 06/12/2023 | Water - PDSD | APPROVED | |||
| 06/12/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/24/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0523-01183 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/24/2023 10:25:07 AM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/24/2023 10:25:12 AM Mechanical(M) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/24/2023 11:39:48 AM 1. Captive Air Sheet 1/Hood Information: Based on the the type of cooking equipment located under the hood, the hood would be providing exhaust for heavy-duty cooking appliances. The design CFM/ft. provided is incorrect. The design CFM/ft. provided is listed as 240 CFM/ft. and the prescriptive design CFM/ft. is listed as 400 CFM/ft. Provide clarification for the discrepancy or provide a properly designed Type I hood in accordance with 2018 IMC Section 507.5.2. 2. Sheet M1.0: Provide a section detail through the grease duct and exhaust fan that clearly indicates the mounting methods, penetrations, access, etc. 2018 IMC Section 507.2.4. 3. Sheet M1.0: Provide the chosen duct wrap manufacturer specifications along with the desired listed assembly that is being used and include them in to the construction documents. 4. Sheet M1.0 Note 7: Note 7 indicates that the exhaust duct material will be welded 16 gauge black iron. This is not an approved material. Provide a correct grease duct material in accordance with 2018 IMC Section 506.3.1.1. 5. General: The construction documents do not provide the type and clearance separation from the combustible construction, such as smooth, cleanable, nonabsorbent and noncombustible material. Please provide documentation within the plans confirming that the Type I hoods in this project are clear of combustibles pursuant to 2018 IMC Section 506.3.6. Electrical(E) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/24/2023 11:39:40 AM 1. General: Provide a prescriptive path or provide COMcheck calculations for the lighting. All mandatory requirements must be identified on the plans for compliance. Plumbing(P) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/24/2023 11:39:55 AM 1. Sheet P1.0: It doesn't appear that the mop sink (MS-1) is not connected to the grease waste line. The mop sink waste will contain grease laden waste and is necessary to be connected to the grease waste line in accordance with 2018 IPC Section 1003.3.1 . 2. Sheet P1.2: To ensure compliance of the gas line design; the inlet pressure, pressure drop, and specific gravity, also provide a gas load summary, size of all piping. (this information is lacking at the piping feeding the fixtures and the amount of BTUs coming in at meter. Additionally, the gas line design is missing for the roof. Please provide more details for the sizing of the gas lines in accordance with the IFGC. 3. General: The construction plans shall include for each floor level a riser diagram of the plumbing water, gas, and waste piping work. The construction plans shall indicate the direction of flow, all pipe sizes, grade of horizontal piping, loading, and location of fixtures and appliances. Please provide a riser diagram for each plumbing system, including gas piping if part of the project. |
||
| 05/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 05/09/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |