Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0523-01177
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/17/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/17/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide a backflow assembly to be installed directly after the new water meter. Reduced pressure backflow prevention assemblies are required at the water meter for multi-use commercial buildings. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf 2. Specify the material used for the water service pipe. Reference: Section 107.2.1, IBC 2018. 3. Provide the size of the replacement water service pipe and the water meter. Verify that the increased pipe length will not result in inadequate water pressure. Reference: Section 604.7, IPC 2018. |
||
| 05/03/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |