Permit Number: TC-COM-0426-00592
Parcel: 105110710

Review Status: In Review

Review Details: COMMERCIAL REVIEW - FULL REVISION v.1

Permit Number - TC-COM-0426-00592
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
07/21/2026 Water - PDSD Standard APPROVED
07/10/2026 Site Engineering Standard NOT REQUIRED
N/A Bldg Permits - Post Review Express PENDING ASSIGNMENT
N/A Commercial Building Standard PENDING ASSIGNMENT
N/A Commercial Electrical Standard PENDING ASSIGNMENT
N/A Fire New Construction Standard PENDING ASSIGNMENT
N/A Outdoor Lighting Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
07/21/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Provide justification for installing HVAC units having a total cooling capacity of 604 MBH that exceeds the total cooling load of 328 MBH shown in the submitted calculations. Reference: Section C403.3.1, IECC 2024.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
07/21/2026 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Correct note #3 of the New Rooftop Unit Schedules, M-201. Condensate drains may not terminate in an area that is not capable of absorbing the condensate flow without surface drainage. See Rooftop Unit Support detail, M-201 for an acceptable method for disposing of condensate. Reference: Section 307.2.1, IMC 2024, as amended by the City of Tucson.
2. The proposed rooftop units use gas-fired heating. Provide a design for the gas supply piping showing:
1. The location of the gas meter
2. The gas delivery pressure (e.g., 7” WG, 2 PSIG, or 5 PSIG)
3. The gas load for each piece of equipment in BTUH
4. The developed pipe length from the meter to each piece of equipment
5. The size and material of each pipe segment.
6. The location and downstream pressure of any pressure reducing valves
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
07/08/2026 PDSD Application Completeness Express REVIEW COMPLETED