Permit Number: TC-COM-0426-00488
Parcel: 14122001E

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0426-00488
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/22/2026 Outdoor Lighting Standard APPROVED
04/28/2026 Water - PDSD Standard APPROVED
05/04/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/04/2026 Commercial Building Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0426-00488
ADDRESS/PARCEL: (8650 E OLD VAIL RD TUCSON, AZ 85747)
Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed.

Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976.

COMMENTS:
1. SEALED/SIGNED/DATED DRAWINGS
a. Provide plans sealed by an Arizona Registrant. Reference: Section 107.1, IBC 2024 and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.
2. APPLICABLE CODES
a. National Electrical Code (NEC) is the wrong year version. Please correct this as 2023.
3. RECEPTION COUNTER
a. Please provide drawings illustrating the following.
b. The tops of work surfaces shall be 28 inches min & 34 inches max above the floor per ICC A117.1 sec 902.4.
c. Sec 306.3.3 Knee clearance shall be 11 inches min in depth at 9 inches above the floor, and 8 inches min in depth at 27 inches above the floor.
d. Sec 306.2.4 Additional toe clearance space extending greater than 6 inches beyond the available knee clearance at 9 inches above the floor.
e. Sec 306.3 Knee clearance shall be 30 inches min in width.
f. 904.3.2 Parallel approach, the counter surface 36 inches min length.
g. 904.3.3 Forward approach, the counter surface 30 inches min length.
4. TURNING SPACE
a. The turning space shall be a circular space with a 67-inch minimum diameter. ICC A117.1 sec 304.3.1.1
b. The keynote and circle space are shown as 60 inches. Please correct.
5. URINAL
a. No other fixtures or obstructions shall be within the required water closet clearance. ICC A117.1 section 604.3.3
b. Clearance around a water closet shall be 60 inches minimum in width, measured perpendicular from the sidewall. ICC A117.1 section 604.3.1
c. Clearance around the water closet shall be 56 inches minimum in depth, measured perpendicular from the rear wall. ICC A117.1 section 604.3.2
d. Please correct this.
6. Please resubmit.
04/24/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0426-00488 (8650 E OLD VAIL RD TUCSON, AZ 85747)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC), A.A.C. – Arizona Administrative Code
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Plans and specifications for installation of the following electrical systems shall be prepared and sealed by an electrical engineer registered in the State of Arizona.
a. Installations, additions, or a modification where the electrical work exceeds 400 amperes, or the available fault current exceeds 22,000 amps.
b. Provide plans prepared and sealed by an electrical engineer registered in the State of Arizona. A.A.C. R4-30-302
2. Provide GFCI protection for all receptacles in the garage area per NEC 210.8(B)(10).
3. Show a GFCI receptacle outlet on the same level within 25’ of exterior HVAC equipment, [NEC 210.62].
4. Correct the load calculations on sheet E4.0, ‘Load Tabulation’ is not consistent with the other calculations on the sheet.
5. Provide a conductor sizing schedule or notes for branch circuits and feeders, NEC 210.19.
6. Provide complete compliance with the 2018 IECC for the interior/exterior lighting, including sensors and lighting controls as required. (typically COMcheck).
04/28/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Provide plans sealed by an Arizona Registrant. Reference: Section 107.1, IBC 2024 and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
04/28/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Provide plans sealed by an Arizona Registrant. Reference: Section 107.1, IBC 2024 and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
04/14/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TC-COM-0426-00488 (1st Review)
Project: NEW MTEL BLDG USED FOR TRUCK REPAIR PARTIAL OFFICE, R.R. AND STORAGE ROOM
Location: 8650 E OLD VAIL RD
Review Date: 4/14/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering

Site Engineering Review Comments:
1. After review of the provided commercial building plans and the associated Development Package (Site Plan) TD-DEV-0224-00040, it appears that there is a new equipment enclosure proposed on the west side of the new building within the pedestrian sidewalk which was not referenced or shown on the development package plans. Next steps:
a. Revise the current commercial building plan set to follow suit with what was approved in the DP. This includes building footprint, dimensions, square footage, and downspout locations
b. Revise the Development package TD-DEV-0224-00040 to follow suit with what is desired/intended. If revision to the DP is pursued, Site Engineering will be unable to provide full approval to TC-COM-0426-00488 until the DP revision is reviewed and approved by all associated reviewers


If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
04/29/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD ZONING REVIEW TRANSMITTAL

FROM:
Bobby Parsons
Zoning Review Section

PROJECT:
TC-COM-0426-00488 – TD-DEV-0224-00040
8650 E. Old Vail Rd. Tucson, AZ 85747
New Metal Building (1st Review)

TRANSMITTAL DATE: 4/29/2026

Resubmit a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the I-2 zone (UDC 4.7.30). Trade service and repair (major) is an allowed use subject to Use Specific Standards 4.9.4.X.1 and 4.9.13.Q.

1. Comment: The site plan provided calls out a new mechanical enclosure within the pedestrian sidewalk on the westside of the building, however this structure was not called out in the associated Development Package (TD-DEV-0224-00040). Please either revise the DP to show this structure or remove it from the proposed scope of work.
2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
04/30/2026 Fire New Construction Standard REVIEW COMPLETED
04/09/2026 PDSD Application Completeness Express REVIEW COMPLETED