Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0425-00812
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/16/2025 | Site Engineering Standard | APPROVED | See Internal Notes | ||
| 05/15/2025 | Site Zoning Standard | APPROVED | See Internal Notes | ||
| 05/14/2025 | Water - PDSD Standard | NOT REQUIRED | |||
| 05/16/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/12/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please have an Arizona Registrant provide a comprehensive damage report indicating the damage sustained by the structure(s). IBC 107.2.1 A. Provide a detailed description indication the scope of the project. IBC 105.1 B. Provide construction documents indicating where the damage occurred on the building. IBC 107.2.1 C. Provide construction documents showing the new construction in the damaged areas. IBC 107.2.1 2. Please amend plans to provide a partial section through the 1-hour wall (number 2 Wall type) and its termination at the roof. IBC 107.2.1 3. Please provide the structural calculations used to design this project. Indicate the rafter spacing and type on the framing plan, show the connection of the porch roof rafters to the existing roof rafters, any blocking, 4. Provide drawings, notes and details for shower wall construction and the interior finishes. IBC 107.2.1 5. Please amend the plans to provide details for membrane and thru-wall penetration firestops. IBC 714.1 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/02/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0425-00811 (3121 N 1ST AV Unit:UNIT B TUCSON, AZ 85719) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Show locations of each smoke alarm, R310 [NFPA 72]. Notate that all smoke alarms must be interconnected with a power source from the building wiring and be equipped with battery backup. 2. Show the location of a carbon monoxide detector outside of bedroom doors, when the dwelling includes an attached garage or gas appliance, R311 [NFPA 72]. 3. Show receptacle outlets at each kitchen counter space wider than 12” with no point along the wall line more than 24” from a receptacle outlet, E3901.4.1 [210.52(C)(1)]. Show receptacles within 2’ of counter edges or corners and no more than 4’ apart. 4. Show two or more 2O AMP small appliance circuits at the kitchen countertop receptacle outlets; they may also serve the breakfast room and dining room, but not other locations, E3703.2 [210.52(C)(1)] and E3901.3 [210.52(B)(1)]. GFCI protected, E3902.6 [210.8(A)]. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 05/14/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Sections R403 and R503.1.2, IECC 2018. 2. Show the complete specifications for each air conditioner system, including the SEER2 and HSPF2 for each system. Current Federal Regulations require residential packaged heat pumps to have a minimum SEER2 13.4 and a minimum HSPF2 6.7. Reference: Section R103.2, IECC 2018. 3. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. 4. The mini-split heat pump specified in the Mini Split Unit Schedule has been discontinued and the unit shown in the Mini Split Specification (2/M1.0) is a completely different unit. Specify a unit that is currently listed and labeled. The mini-split heat pump Reference: Section 301.7, IMC 2018. 5. Provide mechanical ventilation for the building. Reference: Sections R403.6 and R503.1.2, IECC 2018. 6. Secure the refrigerant circuit access ports of the condensing units to prevent unauthorized access. Reference: Section 1101.10, IMC 2018. |
||
| 05/14/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Coordinate the water supply isometric and the waste and vent isometric with the actual locations of the plumbing fixtures. Reference: Section 107.2.1, IBC 2018. 2. To clarify the installation of the water heaters, provide a detail of the water heater installation, including the excess pressure relief: Show the location of the water heaters on a plumbing floor plan. Reference: Section 107.2.1, IBC 2018 and Sections 503.1, and 504, IPC 2018. 3. Show the size, route, and termination of the T&P relief piping for the water heaters. Reference: Section 504, IPC 2018. 4. Provide a watertight pan of galvanized steel, aluminum, or other approved material under the water heater with a drain to an approved location. The drain from a pan located under a water heater shall terminate either to an indirect waste receptor or to the exterior of the building. Reference: Sections 504.7.2 and 802.4, IPC 2018. 5. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Provide insulation per Table C403.11.3, IECC 2018 on the first 8 feet of supply and discharge piping. Reference: Section C404.4, IECC 2018. 6. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. The pressure-absorbing devices shall conform to ASSE 1010; an air chamber is not acceptable. Reference: Section 604.9, IPC 2018. 7. Provide cleanouts for all horizontal drains. Reference: Section 708.1.1, IPC 2018. 8. Connect the fixture vents to the vents through the roof. The vents through the roof may not be used for anything other than a vent. Reference: Sections 9012.1 and 903.4, IPC 2018. 9. Verify that a cleanout is provided at the junction of the building drain and the building sewer (i.e. within 30” of the exterior wall of the building). 10. Provide an air gap discharge indirect waste for the non-potable waste from the HVAC equipment (also, see Section 307.2.1, IMC 2018 as amended by the City of Tucson). Reference: Section 802.1.5, IPC 2018. |
||
| 05/13/2025 | Fire New Construction Standard | REVIEW COMPLETED | See Internal Notes | ||
| 04/23/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |