Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0425-00811
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/06/2025 | Commercial Building Standard | APPROVED | |||
| 07/25/2025 | Commercial Electrical Standard | APPROVED | |||
| 08/05/2025 | Commercial Mechanical Standard | APPROVED | |||
| 08/06/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/05/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. The water heater detail is for a tank-type water heater while the floor plan and the plumbing fixture schedule both show a tankless water heater. Revise the water heater detail per the manufacturer’s installation instructions. Rennai produces propane- and gas-fired tankless water heaters but does not produce an electric tankless water heater, only an electric heat pump water heater. Provide a specification for a listed water heater. [Initial comment: To clarify the installation of the water heaters, provide a detail of the water heater installation, including the excess pressure relief: Show the location of the water heaters on a plumbing floor plan. Reference: Section 107.2.1, IBC 2018 and Sections 503.1, and 504, IPC 2018.] 2. Comment not addressed. Air chambers (#10 in Plumbing Notes, P1.0) only provide temporary protection from water hammer but they do provide an area for bacterial contamination of the water distribution system, [Initial comment: Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. The pressure-absorbing devices shall conform to ASSE 1010; an air chamber is not acceptable. Reference: Section 604.9, IPC 2018.] |
||
| 07/15/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |