Permit Number: TC-COM-0425-00755
Parcel: 13502134M

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0425-00755
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/07/2025 Commercial Building Standard APPROVED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 5/1/2025 4:20:16 PM

Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 5/1/2025 8:08:50 PM
05/07/2025 Commercial Electrical Standard APPROVED Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 5/3/2025 5:27:36 PM
05/13/2025 Site Zoning Standard APPROVED
05/13/2025 Water - PDSD Standard APPROVED
05/01/2025 Outdoor Lighting Standard NOT REQUIRED
05/13/2025 Site Engineering Standard NOT REQUIRED
05/13/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/07/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 5/5/2025 1:13:45 PM
1. General - Provide RTU Schedule. Confirm Units Total CFM values to each unit specific Supply/Return grills/diffusers
total CFM values. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section
[A]107.2.1Information on construction documents.
2. General - Provide Exhaust fan schedule. - 2018 IECC Section C103.2Information on construction documents. - 2018
IBC Section [A]107.2.1Information on construction documents.
3. General - Provide Air Balance Schedule. - 2018 IMC Section 508.1.2 Air Balance.
4. General - Provide specifications for MAU. If unit air is not tempered provide Heat Load Calculation/Summary. Show all
cooling/heating O/A loads on calculations. Confirm unit sizing design. - 2018 IMC Section 508.1.1 Makeup air
temperature. - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads.
05/07/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 5/6/2025 10:28:11 PM
FIRST PLUMBING REVIEW:
1). Plan Page P1.0: missing total gas system length & sizing table used. Add total gas system length & sizing table used.-
2018 IFGC 402.3
2). Plan Page P1.0: Missing notation of what the furthest most remote gas line use is where it appears to be valved and
capped? And gas system notation for the use of the valved capped gas line that exits the building. -2018 IFGC 106.3.1
3). Plan page X1.1: Missing fixture spacing measurements for dual lavatory sidewall & center to center spacing. Also missing
adult toilet fixture spacing side wall to center measurements. Add fixture spacing measurements for all scenarios shown on
floor plan. -2018 IPC 404.2, 405.3.1
05/07/2025 Fire New Construction Standard REVIEW COMPLETED Fire alarm, fire sprinklers and kitchen hood fire suppression alterations will require a separate submittal and permit.
04/22/2025 PDSD Application Completeness Express REVIEW COMPLETED