Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0425-00692
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/29/2025 | Site Zoning Standard | APPROVED | |||
| 04/28/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 04/30/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/22/2025 | Commercial Building Standard | REQUIRES RESUBMIT | 1. Sheet a0.2 Basement and second floor are identified with accessible routes. Elevator should have stand-by power for accessible means of egress per 2018 IBC 1009.4 (BM) 2. Sheet a3.01 Provide for review, keg cooler wall partition and ceiling panel data and installation. Incomplete 2018 IBC 107.2.1 (BM) 3. Sheet a3.1 Key note 327, provide for review specific rated shaft wall type and design detail for review. Identify floor to floor to roof framing detail. Incomplete 2018 IBC 107.2.1 & 713 (BM) 4. Sheet a3.1 Provide for review, walk-in cooler wall and ceiling panel data and installation requirements. Incomplete 2018 IBC 107.2.1 (BM) 5. Sheet a3.2 Key note 327, provide for review specific shaft wall types and construction details for both shafts in mezzanine area per wall type schedule. 2018 IBC 107.2.1. Incomplete (BM) 6. Sheet a3.2.1 Rated walls / shaft is identified and has a wall designation of e-A6. Clarify if wall system is a rated assembly. Not clear 2018 IBC 107.2.1 (BM) |
||
| 04/22/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | 1. Sheet e2.3 Panel 2B is identified in storage RM 20, panel is not identified in panel schedules or schematic feeder wiring diagram. Clarify 2018 IBC 107.2.1 (BM) | ||
| 04/22/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell (928)580-3179. applicable comments followed by the initials (BM) 1. 1. m0.1 EF duct appears to penetrate rated wall at utility 13 and duct extends to a vertical duct. Clarify dampers, shaft and penetration to comply with 2018 IBC 713.10 & 717. Not clear (BM) 2. sheet m1.1 Clarify damper and shaft penetration of 12 x 8 duct near entry. Not clear 2018 IBC 107.2.1 (BM) 3. sheet m1.1 Keynote #2, provide for review detail for FSD installation with access door on duct. Incomplete 2018 IBC 107.2.1 (BM) 4. Sheet m3.0 Provide a FSD and FD types and schedule on plans for review. Incomplete 2018 IBC 107.2.1 (BM) [ Ver. 2 ] [Edited By Bill McClellan] 5. Sheet m3.0 Provide for review, data and details for rated access doors noted on plans. Incomplete 2018 IBC 107.2.1 (BM) |
||
| 04/22/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Sheet p4.2 Natural gas riser diagram, Shut off valves are to be upstream from sediment traps at appliances and regulators when not incorporated as part of the appliance to comply with 2018 IFGC 408.4 (BM) | ||
| 04/29/2025 | Design Review Standard | REQUIRES RESUBMIT | Design Package includes sidewalk planters, bike racks. * Revise this permit to show bike racks on the greyed-out exterior area. * Apply for a Development Package showing exterior improvements (Bike racks, planters, any associated irrigation/other). Design review approval requires approved Development Package to demonstrate full compliance with Design Review Board approval. |
||
| 04/28/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/09/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 04/30/2025 | Water - PDSD Standard | REVIEW COMPLETED |