Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0425-00651
Parcel: 11451200B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0425-00651
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/08/2025 Commercial Building Standard APPROVED
07/08/2025 Commercial Electrical Standard APPROVED
07/08/2025 Commercial Mechanical Standard APPROVED
07/08/2025 Commercial Plumbing Standard APPROVED
07/08/2025 Outdoor Lighting Standard APPROVED
07/24/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/23/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TC-COM-0425-00651
Location: 8825 E Tanque Verde RD
Review Date: 7/23/2025
Site Engineering Comments:
1. The associated development package, TD-DEV-0425-00097, must be approved by all reviewers and issued prior to the approval of this permit submission. UDC Article 3.3.3.7.a

Marco Contreras - marco.contreras@tucsonaz.gov
07/24/2025 Site Zoning Standard REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0425-00651 - TD-DEV-0425-00097
8825 E TANQUE VERDE RD. – C-2
Self Service Car Wash (2nd Review)

TRANSMITTAL DATE: July 24, 2025

DUE DATE: July 23, 2025

Provide a detailed response letter with your next submittal that clearly shows how you have addressed all Zoning comments.

This site is located in the C-2 zone (UDC 4.7.21). Automotive: Full Service Car Wash - is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standard 4.9.13.E.

1. Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0125-00008 and although it appears that the building plans match the DP, until the DP is approved by all review agencies Zoning cannot approve this building permit.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
07/23/2025 Water - PDSD Standard REQUIRES RESUBMIT An approved utility permit is required prior to approval of the water service. [Initial comment: An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Revise the plumbing site plan to show the installation of the water service to the building and the installation of the building sewer (See C401 in the development package). Reference: Sections 107.2.1 and 107.2.6, IBC 2018.]
07/01/2025 PDSD Application Completeness Express REVIEW COMPLETED