Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0425-00651
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/08/2025 | Commercial Building Standard | APPROVED | |||
| 07/08/2025 | Commercial Electrical Standard | APPROVED | |||
| 07/08/2025 | Commercial Mechanical Standard | APPROVED | |||
| 07/08/2025 | Commercial Plumbing Standard | APPROVED | |||
| 07/08/2025 | Outdoor Lighting Standard | APPROVED | |||
| 07/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/23/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-0425-00651 Location: 8825 E Tanque Verde RD Review Date: 7/23/2025 Site Engineering Comments: 1. The associated development package, TD-DEV-0425-00097, must be approved by all reviewers and issued prior to the approval of this permit submission. UDC Article 3.3.3.7.a Marco Contreras - marco.contreras@tucsonaz.gov |
||
| 07/24/2025 | Site Zoning Standard | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0425-00651 - TD-DEV-0425-00097 8825 E TANQUE VERDE RD. – C-2 Self Service Car Wash (2nd Review) TRANSMITTAL DATE: July 24, 2025 DUE DATE: July 23, 2025 Provide a detailed response letter with your next submittal that clearly shows how you have addressed all Zoning comments. This site is located in the C-2 zone (UDC 4.7.21). Automotive: Full Service Car Wash - is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standard 4.9.13.E. 1. Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-0125-00008 and although it appears that the building plans match the DP, until the DP is approved by all review agencies Zoning cannot approve this building permit. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 07/23/2025 | Water - PDSD Standard | REQUIRES RESUBMIT | An approved utility permit is required prior to approval of the water service. [Initial comment: An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Revise the plumbing site plan to show the installation of the water service to the building and the installation of the building sewer (See C401 in the development package). Reference: Sections 107.2.1 and 107.2.6, IBC 2018.] | ||
| 07/01/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |