Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0424-00712
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/20/2024 | Site Zoning | APPROVED | |||
05/22/2024 | Water - PDSD | APPROVED | |||
05/21/2024 | Site Engineering | NOT REQUIRED | |||
05/22/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/10/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/6/2024 11:50:49 AM 1. No structural work being completed. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/6/2024 11:39:01 AM 1. Sheet A-0.2/Occupant Load: The occupant load calculations provided are incorrect. There are multiple uses provided within the tenant space. (A-3 (Waiting room) & B). Provide a space by space occupant load calculation in accordance with Table 1004.1.2. ◦ There is a distinct difference between occupancy classification and occupancy use. The exceptions provided in Section 303.1.2 apply to that of classification and the requirements of max. allowable area, height, stories, mixuse requirements and overall classification of the building. So yes, the the waiting room is considered as business in the overall context of the structure and can comply with the business requirements previously mentioned. However, when calculating occupant loads, one must calculate based on the use of the space. The waiting room's use is assembly and the occupant load must be calculated as such in accordance with Section 1004 and Table 1004.1.2. Mechanical(M) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 5/6/2024 11:45:11 AM 1. General: Prepare mechanical calculations to show that ventilation requirements are met and balanced. Include a ventilation schedule to drawings in accordance with 2018 International Mechanical Code Section 403.1 and Table 403.3. 2. General: Please provide a COMcheck that indicates compliance for new mechanical system and scan that data onto one of the mechanical sheets. This provides evidence the mechanical system is in compliance in accordance with the 2018 IECC Section C403.1. Electrical(E) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/6/2024 11:50:35 AM Plumbing(P) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/6/2024 11:49:38 AM |
||
04/23/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/23/2024 | PDSD Application Completeness | REVIEW COMPLETED |