Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0424-00709
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/06/2024 | Water - PDSD | APPROVED | |||
05/09/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/09/2024 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Sheet G1.1: Please amend the sheet index and page labels to ensure the sheets listed in the index are included in the plan set. IBC 107.2.1 For example, the “L-1 thru L-6” sheets are not in this set and two sheets are labeled E1.1 2. Sheet G1.2: Please amend plans to provide a detailed description of the work involved in the scope of this permit. IBC 105.3 3. Sheet G1.2: Please amend drawing and details to provide the clearance required by 2009 ICC A117.1 2009 ICC A117.1 604.9.2.1 The call outs for the details appears to be reversed.please reconcile. 4. Sheet G1.2: Please amend plans to show all new toilet rooms are accessible IBC 1109.2 5. Sheet A2.1: Please amend plans to name the Toilet Rooms, and their Use. Also provide required signage. IBC 107.2.1, IBC Section1111 For example, Male, Female, etc. 3. Please amend plan to provide a Means of Egress/Life Safety Exiting plan to include: a. The path(s) of exit discharge is shown to a public way or a safe dispersal area. IBC 107.2.3, 1028.5 b. The path(s) of exit discharge has a slip-resistance surface. IBC 1003.4, ICC Interpretation No 16-08 c. The path(s) of exit discharge gates have only egress door equivalent hardware. IBC 1010.2 d. Changes in elevation < 12 inches use sloped surfaces along the path of exit discharge. IBC 1003.5 e. A photometric plan or other method of showing 1 footcandle of normal power illumination at the walking surface along the path(s) of exit discharge, while the building is occupied. IBC 1008.2.1, IBC 1008.2.3 f. The number of occupants is shown for every room and space. IBC 107.2.3 g. The occupant load factor and area are shown for every room and space. IBC 1004.5 h. Assembly occupancy spaces show occupant load signage. IBC 1004.9 i. Doors/gates serving a space with ≥ 50 persons swing in the direction of egress travel. IBC 1010.1.2.1 j. Doors/gates serving a space with ≥ 50 persons in A or E occupancies have panic hardware. IBC 1010.1.10 Amend plans Please provide the structural calculations for the shade structure with your next submittal. IBC 107.2.7 Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
05/06/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Ref; Electrical line diagram and Panel Schedules. 1a The line diagram shows panel ‘LD’ as existing and rated at 400 amps. The panel schedule shows “Provide Panel” and panel equipped with 2–200-amp OCPD’s and a 200-amp MCB and a load at 252 amps. Please clarify. 1b The line diagram shows panel ‘L1’ as a sub-panel fed from panel ‘LD’. The panel schedule shows panel ‘L1’ as an All-in-One – Meter configuration. Is this correct? If not, please revise. 1c Please show the location of panel ‘L2’ in the ‘Electrical Site Plan’. Ref; 2018 IBC section 107.2.1, 2017 NEC. |
||
05/06/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Show that each heat pump meets the requirements of Section C403.5, IECC 2018 (economizers) unless exempted by compliance with the efficiency requirements of Table C403.5 (2) and Section C503.4.1, IECC 2018. 3. Clarify the efficiency bases for the two heat pumps. The equipment schedules call out SEER2 ratings but the COMcheck is based on SEER ratings. |
||
05/06/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Show how the T&P relief piping for WH-1 can extend to daylight without being trapped. Reference: Section 504.6, IPC 2018. 2. Verify that the paths from the crawl space access to the three cleanouts located below the floor have a minimum vertical clearance of 24 inches. Reference: Section 708.1.10, IPC 2018. 3. Verify that the proposed grease interceptor can be used with a food waste disposal unit. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. Reference: Section 1003.3, IPC 2018 as amended by the City of Tucson. |
||
04/23/2024 | Fire New Construction | REQUIRES RESUBMIT | -Include life safety plan showing exiting and travel distance. Exiting shall be to a public way. Verify the proper gate swing, in the direction of egress travel, for gates serving the means of egress with an OL of 50 or more, IFC 1010.1.2.1. Gates serving an area with an OL of 50 or more shall have panic hardware. IFC 1010.1.10. Provide a door schedule including the gate hardware. john.vincent@tucsonaz.gov 5203495581 |
||
05/09/2024 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
05/08/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC Transmittal FROM: Loran Shamis, Project Manager PDSD Zoning Review Section PROJECT: TC-COM-0424-00709 – Wine Bar Cafe New Alcoholic Beverage Service (Bar) (1st review) 15 N Santa Rita Avenue TRANSMITTAL DATE: May 8, 2024 DUE DATE: May 7, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Zoning has conducted a cursory review of the building permit plan set and while it appears the site plan is consistent with the development package. Zoning cannot approve the building permit plan set until the development package has been approved. For questions regarding Zoning comments, please contact me at: Loran.Shamis@tucsonaz.gov |
||
04/22/2024 | PDSD Application Completeness | REVIEW COMPLETED |