Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.4
Permit Number - TC-COM-0424-00648
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/16/2024 | Site Engineering | APPROVED | |||
10/22/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/25/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 9/23/2024 12:30:36 PM The responses by WD Partners in "Response Letter - ADD #1 Tucscon AZ_v3.pdf" will resolve the remaining comments. However, the uploaded drawings do not include the revisions described in the Response Letter. Please revise the drawings per the approved responses and resubmit. 1. RESOLVED 2. RESOLVED 3. RESOLVED 4. RESOLVED 5. FCCS - PROJECT ADDRESS: The address provided on Cover Sheet FCCS (2020 S. Muskogee Ave, Tahlequah, OK 74464) does not match the project address on the title block (7150 E Speedway Blvd, Tucson, AZ 85710). Construction documents are site-specific and it is not permissible to re-use drawings at multiple locations. Please revise the address on the cover sheet to match the address of the building application. i. Response from WD Partners: "Sheet FCCS has been removed from this submission." Sheet FCCS was not removed from "CONS-1291-1001 Tucson AZ Fuel - ADD#5 - Complete set_v4.pdf". Please confirm. 6. FSS0 - CONFLICTING INFORMATION: Under "Canopy Lateral Loads" on structural general notes Sheet FSS0, ultimate wind speed is called out as 115 mph. This conflicts with the general notes provided by the canopy manufacturer on Sheet FCS1.3 that states that canopies are designed for an ultimate wind speed of 103 mph. Please confirm which notes control and revise to resolve this conflict. i. Response from WD Partners: "Canopy Lateral Loads on sheet FSSO are the correct loads. Sheet FCS1.3 has been updated accordingly." Sheet FCS1.3 has not been updated in the uploaded drawings. Please confirm. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/23/2024 12:54:10 PM 1. Unresolved - General: Include the details showing compliance with the envelope and the mechanical provisions of the 2018 IECC sections C402, C403. The plans do not include the insulation R-Values of the walls and ceiling or the UFactors of the windows and doors. If the envelope components do not meet the prescriptive values, please submit the 2018 COMcheck for the envelope. THE PLANS STILL DO NOT SHOW THE ENVELOPE (INCLUDING WINDOWS AND DOORS) INSULATION VALUES. A COMCHECK REPORT WAS ALSO NOT INCLUDED. 2. Resolved - Sheet FSCS: If all canopy documents are included in the construction drawings, please remove the Fuel Station Canopy from the list as a deferred submittal. (2018 IBC section 107) 3. Unresolved - Sheet FSCS: Include a scope of work, if fire alarm and sprinkler systems are being installed, and the allowed vs actual area, height, and number of stories. (2018 IBC sections 107, 501, 504, 506) INFORMATION WAS STILL NOT PROVIDED. 4. Unresolved - Sheet FSA5: Show the accessible route, maneuvering clearances, signage, and accessible service counter details. Include the dimensions of the maneuvering clearance area in front of the toilet room doors. (2018 IBC section 107, 1104, 1109.12, 1111, 2009 ICC A117.1 sections 402, 403, 404, 404.2.3.2, 703, 904) The accessible route, maneuvering clearances, and accessible counter details were not provided. THE MANEUVERING CLEARANCES AND DIMENSIONS AT THE TOILET ROOM DOORS ARE STILL NOT SHOWN (REFER TO SECTION 404.2.3.2) AND INCLUDE THE DOOR HARDWARE BEING INSTALLED. THE DETAILS/DIMENSIONS FOR THE ACCESSIBLE COUNTER WERE NOT PROVIDED. Mechanical(M) Reviewer (from previous submittal TUC9550001.061324) Jorge Valido jvalido@safebuilt.com Approved with Comments Reason: Date Completed : 6/14/2024 4:50:50 PM 1. (RESOLVED) - General - Provide Ventilation Calculation/Schedule - 2018 IMC Section Table 403.3.1.1 2. (RESOLVED) - General - Provide location of cooler condensers - 2018 IBC Section [A]107.2.1Information on construction documents. 3. (RESOLVED) - General - Provide tie down and Seismic/Wind Restraint detail for the Cooler Condensers - 2018 IMC Section Section 301.15 Wind resistance and Section 301.18 Seismic resistance. i. As per the Response Letter Dated June 4, 2024, Seismic and wind restraints will be provided by condenser manufacturer. Inspector to confirm restraints at time of Mechanical Roof Inspection. 4. (RESOLVED) - General - Provide Roof Plan. Show clear dimensions of serviceable equipment from edge of building. Show clear dimensions from outside air intakes to exhaust outlets. - 2018 IMC Section [BE]304.11Guards 5. (RESOLVED) - General - Provide ComCheck Mechanical Compliance Certificate or other Approved/Certified program. - 2018 IECC Section C403.1.1 Calculations of heating and cooling loads. and C403.2.3 HVAC equipment performance requirements. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 6/13/2024 5:24:20 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 9/24/2024 9:44:35 PM Third Plumbing Review: Resolved-1)..General: Plumbing plans and or any any plan pages not uploaded to document files. Please upload plan sets for review: -IPC 2018 106.3.1 Unresolved-2). Plan page FSA4: Plan page missing secondary thru wall scupper adjacent to the primary scupper. ( note: the required secondary over-flow can't be located beyond roof in the exterior downspout assembly.) Add a secondary thru wall scupper to the plan page in accordance with -IPC 1106.5 & section 1108 **Nothing on this page states secondary thru wall scupper, please cloud** |
||
10/22/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0424-00648 - TD-DEV-0524-00143 7150 E SPEEDWAY BL. – PAD-3 Fuel Station @ Walmart (3rd Review) TRANSMITTAL DATE: October 22, 2024 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the P-I zone (UDC 4.7.29). Automotive Minor is a allowed use in the zone (UDC Table 4.8-5), subject to Use Specific 4.9.13.E. 1. Please provide a site plan. Zoning will need to stamp the site plan for approval to ensure the site location matches the DP. The site plan can be the approved DP site plan, but it must be in the plan-set. If you have any questions about this transmittal, please contact nicholas.martell@tucsonaz.gov |
||
09/18/2024 | PDSD Application Completeness | REVIEW COMPLETED |