Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.6
Permit Number - TC-COM-0424-00648
Review Name: COMMERCIAL REVIEW - FULL v.6
Review Status: In Review
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
N/A | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
N/A | Site Zoning | PENDING ASSIGNMENT | |||
11/12/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 11/8/2024 11:04:21 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/7/2024 8:24:00 AM 1. Unresolved - General: Include the details showing compliance with the envelope and the mechanical provisions of the 2018 IECC sections C402, C403. The plans do not include the insulation R-Values of the walls and ceiling or the UFactors of the windows and doors. If the envelope components do not meet the prescriptive values, please submit the 2018 COMcheck for the envelope. THE PLANS STILL DO NOT SHOW THE ENVELOPE (INCLUDING WINDOWS AND DOORS) INSULATION VALUES. A COMCHECK REPORT WAS ALSO NOT INCLUDED. ***Provide the window and door U-Factors in the window and door schedules. The response letter stated that the information and COMcheck envelope report was provided but the fenestration U-Factors could not be located on the plans and the referenced COMcheck was not submitted with the revised plans. Please specify and cloud the location of the revised or added information on the plans and detail the sheet number and location on the response letter. *** 2. Resolved - Sheet FSCS: If all canopy documents are included in the construction drawings, please remove the Fuel Station Canopy from the list as a deferred submittal. (2018 IBC section 107) 3. Unresolved - Sheet FSCS: Include a scope of work, if fire alarm and sprinkler systems are being installed, and the allowed vs actual area, height, and number of stories. (2018 IBC sections 107, 501, 504, 506) INFORMATION WAS STILL NOT PROVIDED. *** Specify if a fire alarm system is to be installed. Include a list of deferred submittals if not providing the fire alarm plans at this time. *** 4. Unresolved - Sheet FSA5: Show the accessible route, maneuvering clearances, signage, and accessible service counter details. Include the dimensions of the maneuvering clearance area in front of the toilet room doors. (2018 IBC section 107, 1104, 1109.12, 1111, 2009 ICC A117.1 sections 402, 403, 404, 404.2.3.2, 703, 904) The accessible route, maneuvering clearances, and accessible counter details were not provided. THE MANEUVERING CLEARANCES AND DIMENSIONS AT THE TOILET ROOM DOORS ARE STILL NOT SHOWN (REFER TO SECTION 404.2.3.2) AND INCLUDE THE DOOR HARDWARE BEING INSTALLED. THE DETAILS/DIMENSIONS FOR THE ACCESSIBLE COUNTER WERE NOT PROVIDED. ***The door hardware details are still not included in the plans (door schedule). A minimum of 48” maneuvering clearance perpendicular to the door is required for front approach or if closers and latches are installed. Include the clearance distance adjacent to the latch side of the door. Refer to the 2009 ICC A117.1 Figure 404.2.3.2. *** Mechanical(M) Reviewer (from previous submittal TUC9550001.061324) Jorge Valido jvalido@safebuilt.com Approved with Comments Reason: Date Completed : 6/14/2024 4:50:50 PM 1. (RESOLVED) - General - Provide Ventilation Calculation/Schedule - 2018 IMC Section Table 403.3.1.1 2. (RESOLVED) - General - Provide location of cooler condensers - 2018 IBC Section [A]107.2.1Information on construction documents. 3. (RESOLVED) - General - Provide tie down and Seismic/Wind Restraint detail for the Cooler Condensers - 2018 IMC Section Section 301.15 Wind resistance and Section 301.18 Seismic resistance. i. As per the Response Letter Dated June 4, 2024, Seismic and wind restraints will be provided by condenser manufacturer. Inspector to confirm restraints at time of Mechanical Roof Inspection. 4. (RESOLVED) - General - Provide Roof Plan. Show clear dimensions of serviceable equipment from edge of building. Show clear dimensions from outside air intakes to exhaust outlets. - 2018 IMC Section [BE]304.11Guards 5. (RESOLVED) - General - Provide ComCheck Mechanical Compliance Certificate or other Approved/Certified program. - 2018 IECC Section C403.1.1 Calculations of heating and cooling loads. and C403.2.3 HVAC equipment performance requirements. Electrical(E) Reviewer (from previous submittal TUC9550001.061324) Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 6/13/2024 5:24:20 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 11/10/2024 1:23:41 PM Fourth Plumbing Review: OK Subject to Field Inspections Resolved-1)..General: Plumbing plans and or any any plan pages not uploaded to document files. Please upload plan sets for review: -IPC 2018 106.3.1 Resolved-2). Plan page FSA4: Plan page missing secondary thru wall scupper adjacent to the primary scupper. ( note: the required secondary over-flow can't be located beyond roof in the exterior downspout assembly.) Add a secondary thru wall scupper to the plan page in accordance with -IPC 1106.5 & section 1108 |
||
11/06/2024 | PDSD Application Completeness | REVIEW COMPLETED |