Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0424-00609
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/17/2024 | Commercial Electrical | APPROVED | |||
08/27/2024 | Commercial Structural | APPROVED | |||
09/17/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/16/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Connecting the 8” roof drains to 4” x 5” downspouts is a reduction in size in the direction of flow which isn’t allowed. Reference: Section 1101.5, IPC 2018. [Second comment: The proposed roof drainage design is puzzling. The design calls for 8” roof drains (each good for 1,117 GPM), 4” x 5” drain leaders (external drain pipes that are each good for 360 GPM) and no provision for secondary (overflow) drainage. See Sections 1105, 1106, and 1108, IPC 2018 for design guidance.] [Initial comment: Clarify the design for the roof drainage. Key notes 06 and 07 call out a 6” x 8” primary scupper and a 6” x 12” overflow scupper respectively but the roof plan (01/A1.102) and the North Elevation (01/A2.101) show primary roof drains and no scuppers. Reference: Section 107.2.1, IBC 2018.] | ||
08/16/2024 | PDSD Application Completeness | REVIEW COMPLETED |