Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0424-00585
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/05/2024 | Site Engineering | APPROVED | |||
| 08/05/2024 | Water - PDSD | NOT REQUIRED | |||
| 08/05/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/08/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 7/8/2024 8:07:57 AM 1. Resolved - Sheet C1.1: Include the entire fire separation UL design for the separation wall or walls between units B and C. other sheets show two walls as part of the assembly. Provide the details for the membrane and through penetrations of the separation wall. (2018 IBC section R302.1, R302.4) Penetration details of the fire rated walls were not provided. 2. Resolved - Sheets C1.1, A1.0.A, A1.0.B: Include the fire rated exterior wall assembly design for the walls with only a one-foot fire separation distance between the two buildings. Roof projections less than 2ft to the imaginary line between the buildings are prohibited. Please revise all affected sheets. (2018 IBC section R302.1, Table R302.1(1)) 3. Resolved - Sheet C1.1: Include the lists of deferred submittals and special inspections. 2018 IRC section R106) 4. Resolved - Sheet A1.0.A: The laundry room is labeled as a kitchen. Please revise all affected sheets. (2018 IRC section R106) 5. Resolved - Sheets A1.0.A, A1.0.B, A1.1.A, A1.1.B: Specify the windows in hazardous locations that are safety glazed. (2018 IRC section R308.4) In bedroom #4 in the single dwelling unit and all bedrooms in the duplex window 1D is not identified as being safety glazed. 6. Unresolved - Sheets A1.1.A, A1.1.B: Include the U-Factors of the windows and doors. Show the window clear openings meeting the egress requirements of the 2018 IRC section R310. (2018 IECC section R402) Not revised. THE CLEAR OPENING DETAILS WERE NOT INCLUDED. IT APPEARS THAT THE ROUGH OPENINGS OF THE BEDROOM WINDOWS ARE 3’X4’ FOR SLIDING WINDOWS WHICH WOULD NOT PROVIDE THE REQUIRED CLEAR OPENING AS DETAILED IN 2018 IRC SECTION R310. THE MINIMUM REQUIRED WIDTH OF THE CLEAR OPENING IS 20” AND THE MINIMUM AREA IS TO BE AT LEAST 5.0 SF ON MAIN FLOOR WINDOWS. 7. Resolved - Sheets A3.0.A, A3.0.B: Include the wall and ceiling insulation R-Values showing compliance with the 2018 IECC section R402 Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 7/8/2024 8:09:30 AM 1. Resolved - Manual J and S calculation reports: Provide the reports for each unit, label which unit the reports are for, and include the equipment details corresponding with the calculation results. (2015 IECC section R403.7) 2. Unresolved - Sheets M1.01, M1.02: Detail the bathroom exhaust fans vent to the exterior. (2018 M1505.2) Details not included. THE DETAILS AND NOTES STILL DO NOT SPECIFY THAT THE BATHROOM EXHAUST FANS ARE VENTING TO THE EXTERIOR. 3. Unresolved - Sheets M1.01, M1.02: Show the location of the dryer exhaust vents and their distances from openings. (2018 IRC section M1502) The dryer vent detail added to sheet M0.01 shows a mesh screen over the vent termination. Section M1502.3 prohibits screens on the duct termination. THE DETAILS AND NOTES SPECIFY THE DRYER IS EXHAUSTED THROUGH THE ROOF BUT THE VENT TENINATION DETAILS ON SHEET M 0.01 STILL SHOW AND STATE A WIRE MESH SCREEN IS INSTALLED. 4. Resolved - Sheets M1.01, M1.02: Show the walkway and platform for the HVAC equipment in the attics. Include the drawings showing the drain pans and condensate drain piping. (2018 IRC section M1305.1.2) Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 7/8/2024 8:08:31 AM 1. Resolved - Sheets C1.1, E2.02, E3.02: Include the electric vehicle charging station on the panel schedules, plans, and calculations. (2018 IRC section R106) 2. Unresolved – Sheets E1.03, E2.01 (One-Line Diagram): Show the correct voltage for the electrical service as detailed in the panel schedules. Show the locations of all electrical equipment, rating of the meter, service entrance conductors, and proper grounding electrode conductors for both buildings. (2018 IRC section R106) The service and separate building grounding electrodes are not shown on the one-line diagram. The 500Amp main disconnect, meters, and service locations are not shown on the plans. The grounding details are not legible. THE ELECTRICAL PLANS ON SHEET E1.03 SHOWS THAT THERE ARE TWO METERS AND TWO 500A MAIN DISCONNECTS FEEDING FOUR SUBPANELS. THE ONE LINE DIAGRAM ONLY SHOWS ONE 500A MAIN DISCONNECT/PANEL FEEDING THE FOUR SUBPANELS. THE POINTS OF CONNECTION OF THE GROUNDING ELECTRIDE CONDUCTORS ARE NOT SHOWN FOR THE SERVICE AND THE SEPARATE BUILDING. 3. Resolved - Sheet E2.02: Include the site panel schedule and calculations. (2018 IRC section R106) 4. Resolved - Sheets E3.01, E3.02: Show the closet light details and distance to the storage spaces. (2017 NEC sections 410.2, 410.16) 5. Resolved - Sheets E3.01, E3.02, E4.01, E4.02: Show the locations of all electrical service equipment. (2018 IRC section R106) The 500Amp main disconnect, meters, and service locations are not shown on the plans. 6. Resolved - Sheet E4.01: Missing receptacles on the counter above the dishwasher, within 6ft of the start of the wall in the laundry room, and bedroom #4. (2017 NEC section 210.52) 7. Resolved - Sheet E4.02: Missing receptacles on the dining room wall next to the door in both units, within 6ft of the door in the living rooms in both units, and for the refrigerator. (2017 NEC section 210.52) Still missing the receptacles within 6ft of the family room doors. 8. Resolved - Sheet E4.02: The exterior receptacles are not identified as being GFCI protected. (2017 NEC section 210.8) |
||
| 07/31/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0424-00577 & TC-COM-0242-00585 - TD-DEV-0324-00066 526 N WESTMORELAND AV. Units A, B & C – R-2 Multifamily (3rd Review) TRANSMITTAL: July 31, 2024 This site is located in the R-2 zone (UDC 4.7.9). Multifamily is a permitted use in this zone (Table 4.8-2), subject to Use Specific Standards 4.9.7.B.6, .9, & .10. 1. Unit Development Package, TD-DEV-0324-00066, is approved by all review agencies Zoning cannot approve these building plans. 2. This comment was not addressed. Provide the dimensions on the building elevations. Perimeter yard setbacks are based on a wall height measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. Where the highest point of the wall meets the eave of the roof. As dimensions were not provided from design grade to the highest point of the wall Zoning cannot determine setback requirements. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 07/03/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |