Permit Number: TC-COM-0423-01162
Parcel: 132082410

Address:
1993 E AJO WY

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0423-01162
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/18/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
07/05/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-0423-01162


GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


Structural(S) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 7/4/2023 12:07:07 AM


Building(B) Reviewer
Janet Matz
jmatz@safebuilt.com
Denied
Reason:
Date Completed : 7/4/2023 12:06:14 AM
Provide a COMCheck or other mythology to verify envelope compliance in accordance to 2018 IECC C402. Response:
Comcheck provided with this submittal.
Please indicate the location of the COMCheck document, it was not found found on the drawings nor in the items submitted


Mechanical(M) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 7/4/2023 12:06:48 AM



Electrical(E) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 7/4/2023 12:06:28 AM



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 7/1/2023 11:23:49 PM
Second Plumbing Review:
1). SAME-Plan page A4.0 needs to include primary & secondary scupper locations along with detail & sizing calculations.-IPC 1106.1, 1106.5, 1108
2).SAME- Plan page A4.0 needs to include downspout sizes along with GPM loads - IPC 1106.3
3). OK
4).OK
5). SAME-add mop sink & faucet manufacturer & model number to FS 2.1 or P6.0 currently states "provided by GC" -IPC 303
6). OK
07/18/2023 Water - PDSD REQUIRES RESUBMIT Comment not addressed. [Initial comment: Coordinate the civil and plumbing plans. The civil plans call for a 2” water meter, 2” RP, and a 2” water service to the building while the plumbing plans call for a 1” water meter, 1-1/2” RP, and a 1-1/2” water service to the building.]
06/28/2023 PDSD Application Completeness REVIEW COMPLETED