Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0423-01142
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/20/2023 | Site Zoning | APPROVED | |||
11/01/2023 | Water - PDSD | APPROVED | |||
10/30/2023 | Site Engineering | NOT REQUIRED | |||
11/01/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/16/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Janet Matz jmatz@safebuilt.com Approved with Comments Reason: Date Completed : 10/16/2023 5:30:27 AM revision to accessible bathroom and wall insulation only. no changes to fee sheet or inspections Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/16/2023 10:32:59 AM 1) General: Please clarify and show the amended details/drawings and include the amended scope of work on the cover sheet. (2009 IBC section 107) 2) Sheet A1.0 (Cover Sheet): The incorrect accessibility code is shown. The plans are to be designed to the 2009 ICC A117.1 accessibility code. 3) Sheet A2.0 (Floor Plan): The toilet room does not meet the maneuvering and clear floor space requirements of the 2009 ICC A117.1 sections 304.3, 305, 603.2, 604.3. Please include the dimensions of the clear floor spaces, grab bars, and distance of the toilet from the wall. 4) Sheets A2.0 and A5.0: Show the signage location and details meeting the requirements of 2009 ICC A117.1 section 703. 5) Sheet A5.0 (Wall Details): Please include the revision description and date of the clouded details. (2009 IBC section 107) Mechanical(M) Reviewer Janet Matz jmatz@safebuilt.com Approved with Comments Reason: Date Completed : 10/16/2023 5:21:45 AM no mechanical changes Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 10/16/2023 10:34:14 AM See the building review comments. There does not appear to be any electrical revisions being made at this time Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 10/15/2023 11:07:44 PM Revised Plan Review: OK |
||
10/25/2023 | Fire New Construction | REVIEW COMPLETED | |||
10/10/2023 | PDSD Application Completeness | REVIEW COMPLETED |