Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0423-01142
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/07/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/07/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Janet Matz jmatz@safebuilt.com Approved with Comments Reason: Date Completed : 10/16/2023 5:30:27 AM revision to accessible bathroom and wall insulation only. no changes to fee sheet or inspections Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/5/2023 12:20:26 PM 1) Resolved - General: Please clarify and show the amended details/drawings and include the amended scope of work on the cover sheet. (2009 IBC section 107) 2) Resolved - Sheet A1.0 (Cover Sheet): The incorrect accessibility code is shown. The plans are to be designed to the 2009 ICC A117.1 accessibility code. 3) Unresolved - Sheet A2.0 (Floor Plan): The toilet room does not meet the maneuvering and clear floor space requirements of the 2009 ICC A117.1 sections 304.3, 305, 603.2, 604.3. Please include the dimensions of the clear floor spaces, grab bars, and distance of the toilet from the wall. The side wall horizontal and vertical grab bars do not meet the requirements of the 2009 ICC A117.1 section 604.5.1. The maneuvering clearances on both sides of the door scale to the correct dimensions but the spaces and dimensions shown do not meet the required clearances at the door. (2009 ICC A117.1 section 404.2.3.5). 4) Resolved - Sheets A2.0 and A5.0: Show the signage location and details meeting the requirements of 2009 ICC A117.1 section 703. 5) Resolved - Sheet A5.0 (Wall Details): Please include the revision description and date of the clouded details. (2009 IBC section 107) 6) Sheet A5.0 (Accessibility Details): Please include the maximum mirror height to the bottom edge (maximum 40”) and indicate insulated pipes under the lavatory to confirm the correct installation of details not shown in the drawings. (2009 ICC A117.1 sections 603.3 and 606.6) Mechanical(M) Reviewer Janet Matz jmatz@safebuilt.com Approved with Comments Reason: Date Completed : 10/16/2023 5:21:45 AM no mechanical changes Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/5/2023 12:22:40 PM See the building review comments. No electrical revisions were identified in the scope of work to the amended plans. No revisions are needed at this time. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 10/15/2023 11:07:44 PM Revised Plan Review: OK |
||
11/03/2023 | PDSD Application Completeness | REVIEW COMPLETED |