Permit Number: TC-COM-0423-01140
Parcel: 12513015B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0423-01140
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2023 Site Engineering APPROVED
05/10/2023 Site Zoning APPROVED
06/01/2023 Water - PDSD APPROVED
06/01/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/16/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved

Building(B) Reviewer
Janet Matz
jmatz@safebuilt.com
Denied
Reason:
Date Completed : 5/15/2023 12:09:43 AM
1. Update the list of applicable codes to include the 2018 International Fuel Gas Code.
2. Provide a signed copy of the COMcheck for the envelope compliance report, the one submitted was not signed or dated.

Mechanical(M) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved

Electrical(E) Reviewer
Janet Matz
jmatz@safebuilt.com
Denied
Reason:
Date Completed : 5/15/2023 12:10:06 AM
1. Correct the typo on sheet E.1 that indicates the keynote 3 for the new UG service lateral. This should be keynote 2.
2. Provide at least one light in the interior of the structure in the vicinity of the electrical panels. 2017 NEC 110.26(d).

Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 5/15/2023 9:09:06 PM
First Plumbing Review:
1). Plan page P.1 needs to include the the GPM load that each set roof drains are responsible for. -IPC 1106.2
2). Plan page P.1 needs to include the gas piping material used -IFGC 403
05/02/2023 Fire New Construction REVIEW COMPLETED
05/01/2023 PDSD Application Completeness Express REVIEW COMPLETED