Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0423-01134
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/21/2023 | Site Engineering | APPROVED | |||
05/15/2023 | Site Zoning | APPROVED | |||
06/06/2023 | Water - PDSD | APPROVED | |||
06/06/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/19/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 5/18/2023 2:40:03 AM 1. Provide structural calculations and/or a letter stamped and sealed from a state licensed structural engineer indicating that the existing roof is sufficient to accept the weight of the new HVAC unit. Building(B) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 5/18/2023 2:35:20 AM 1. The code review checklist on sheet A1.0 indicates this is to be a restaurant with a kitchen area and basement storage, however no specifics have been provided for this use. Indicate that a separate permit will be submitted for the remainder of the tenant improvements. 2. Provide a basement existing/ demo plan for the space on sheet A2.0, only the main floor is shown. The code review on sheet A1.0 indicates the bathrooms will be under a separate permit, but it is unclear if the bathroom walls are to remain as part of this submittal as well as the removal of the small closet under the stairs. Both are shown on the electrical demo plan basement but not on the finished electrical basement plan. 3. The main floor plan indicates the stairway is only 2’-2” wide, however a minimum of 36” is required for egress from this area if it is to be used for storage. Clarify how the minimum life safety egress route from the basement level will be provided and update the exiting plan on sheet A1.0. Mechanical(M) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 5/18/2023 2:38:51 AM 1. Provide a roof plan indicating the proposed location of the RTU and coordinate with the electrical plan, they are shown in different locations. 2. Provide curb details for the new RTU. Electrical(E) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 5/18/2023 2:36:03 AM 1. Indicate an electrical receptacle on the roof for the servicing of the new HVAC unit. 2017 NEC 210.63. 2. Indicate the location of the emergency lighting in the event of a power failure with battery backup on the lighting plans. 2018 IBC 1008.3.1. 3. Indicate the location of an existing emergency light on the exterior at the exit doors to illuminate the landings or indicate new fixtures will be provided. 2018 IBC 1008.3.2 (5). Plumbing(P) Reviewer Janet Matz jmatz@safebuilt.com Conditionally Approved Reason: Date Completed : 5/18/2023 2:39:29 AM no plumbing work has been indicated as part of this submittal |
||
05/17/2023 | Fire New Construction | REVIEW COMPLETED | |||
05/03/2023 | PDSD Application Completeness | REVIEW COMPLETED |