Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0423-01130
Parcel: 124150090

Address:
831 E 17TH ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0423-01130
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/25/2023 Commercial Structural APPROVED
05/11/2023 Site Zoning APPROVED
05/31/2023 Water - PDSD APPROVED
05/16/2023 Site Engineering NOT REQUIRED
06/01/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/30/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 Ref; Plan Sheet E3.0.

The load Summary calls for an 800 amp electrical Service and the CT can on the line diagram shows 600 amp. Please clarify.

Indicate wiring methods between the CT can and the Bussed Gutter.

2 Provide more branch circuit information and connections for the lighting control panel and correlate with the panel schedules. Perhaps include a lighting circuit diagram.

3 Explain how the EM and Exit signs will function properly if they are connected to the nearest unswitched lighting circuits if the lighting circuits are all switched via the lighting control panel. (I don’t see any Night lighting).

Ref; 2018 IBC section 107.2.1, 2017 NEC,
06/01/2023 Commercial Mechanical REQUIRES RESUBMIT 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
2. The fermentation of beer produces large amounts of carbon dioxide. Provide justification for the ventilation of the fermentation room and the perishable goods manufacturing room as unoccupied warehouse spaces. Reference: Section 403.3.1.1, IMC 2018.
06/01/2023 Commercial Plumbing REQUIRES RESUBMIT This activity will result in a change of use from Mercantile and Storage to Factory (F-2) with a significant Assembly (A-2) occupancy as well as the mercantile and storage occupancies. (The factory area will include the all of the equipment from the grist mill through the hot liquor tank, cold liquor tank, fermenting vessels, the brite tanks, and the canning equipment, not just the 3 vessel premier). Provide new plumbing fixture calculations.
05/12/2023 Fire New Construction REVIEW COMPLETED
04/28/2023 PDSD Application Completeness Express REVIEW COMPLETED