Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.3
Permit Number - TC-COM-0423-01128
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/10/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/10/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. The project description states, "REPLACING OLD 100A SERVICE WITH NEW 200A SERVICE”. This does not correlate with what is shown on the electrical plan. 1The electrical plan submitted is not sealed by the Registrant. The plan also shows 2 other panels and a Power and Lighting plan as well as a feed to the existing utility building. Please identify all new work and existing to remain. 2 Where is the lighting in the power and lighting plan? 3 The electrical line diagram is incomplete. Provide a complete electrical line diagram. Show all electrical panels, feeders, conduits, conductor sizes and types, quantities, AIC ratings, Grounding details for all buildings. Compliance with NEC 250.32. 4 The conductor sizes shown in the panel schedule ‘A’ is incorrect. See NEC art 310. 5 The new 200 amp electric service must be fed underground unless the existing service is fed overhead. Per 2018 IBC City of Tucson Amendments. Ref 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |
||
| 08/08/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |