Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0423-01051
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/20/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
07/20/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 7/20/2023 9:12:59 AM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 7/13/2023 12:28:30 PM 1. Sheet A-A9.1: The level 2 staff restroom is not sized appropriately. The water closet vanity is within the clear floor space of the toilet. Provide a correctly sized restroom in accordance with 2010 ADAAG Section 604.3.2. NOT COMPLIED Note: The 60"x60" clear floor space does not measure to that size and is incorrectly sized. Provide a clear floor area and a properly sized accessible restroom in accordance with 2010 ADAAG Section 604.3.2 1. Sheet A-B9.0: The level 2 restroom is not sized appropriately. The water closet vanity is within the clear floor space of the toilet. Provide a correctly sized restroom in accordance with 2010 ADAAG Section 604.3.2. NOT COMPLIED Note: The 60"x60" clear floor space does not measure to that size and is incorrectly sized. Provide a clear floor area and a properly sized accessible restroom in accordance with 2010 ADAAG Section 604.3.2 Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Conditionally Approved Reason: Date Completed : 7/13/2023 7:25:29 PM All corrections complied Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 7/15/2023 6:19:00 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 7/14/2023 11:28:02 PM Second Plumbing Review: 1). OK 2). OK 3). SAME-plan pages A-A4.0 AB4.0, P-A1.9, P-B1.3 needs to detail the primary/secondary scupper & downspout sizes with calculations - IPC 1106.1, 1106.3, 1106.5, 1108 ** Downspout sizes still not shown** 4). Same-add Fixture Spacing Measurements to plan pages A-A9.0 & 9.1 , A-B9.0, & 9.1 -IPC 404.2, 405.3.1 ** Still missing measurements for dual lavatories** 5). OK 6). Same-Food prep/coffee sink on plan pages CS2.0, A-B2.0, P-B1.0, P-B1.1 needs to discharge to a grease interceptor. - IPC 1003.1, Tucson Plumbing Amendments ** Provide Documentation from Utility authority allowing no interceptor as stated in response** 7).OK 8). OK 9). Same-Plan set needs to be accompanied with a civil site utility piping plan for continuation of sanitary, water & storm -IPC 106.3.1 10). Added Lavatory detail 218 on P2.1 also needs an ASSE 1070 mixing valve -IPC 419.5 |
||
07/20/2023 | Site Engineering | REQUIRES RESUBMIT | There are two issued development packages for the site (DP21-0352 and TD-DEV-0423-00224) but neither of them show the new buildings proposed in this plan. Please revise one of the open development packages to include this addition or submit for a new development package for the addition. Lianne Evans lianne.evans@tucsonaz.gov |
||
07/18/2023 | Site Zoning | REQUIRES RESUBMIT | This comment was not addressed. Issued DP21-0352 and TD-DEV-0423-00224 in review do not show the configuration on sheet CS.3. until a DP is approved showing the correct configuration Zoning cannot approve this plan. | ||
07/12/2023 | PDSD Application Completeness | REVIEW COMPLETED |