Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0423-00951
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/09/2023 | Commercial Structural | APPROVED | |||
| 05/01/2023 | Site Engineering | APPROVED | |||
| 05/02/2023 | Site Zoning | APPROVED | |||
| 05/09/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/09/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 The electrical line diagrams do not show a Main Service Disconnecting means (Main Circuit Breaker) in what appears to be a MLO, All-in-One type Service equipment. Therefore, categorizing the PV interconnection as a Supply Side Interconnection, not a Load Side as indicated in the plan notes. If there is a Main Breaker installed in the All-in-One or service equipment, please show it and its rating in the Line Diagrams. If not, then please apply the requirements of NEC 690.13 and 705.12(A). Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
| 04/17/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 04/13/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |