Permit Review Detail
Review Status: In Review
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0423-00942
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/10/2025 | Water Sterilization Report (Deferred Submittal) Express | APPROVED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Torque Report Express | PENDING ASSIGNMENT | |||
| 12/10/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | This report is incomplete. The purpose of the balancing report is to ensure that the air distribution system is capable of supplying and exhausting the airflow rates determined by the engineer in compliance with Sections 403.3, IMC 2018. This report has not presented the required and actual outside air flow rates for air handlers RTU-1, RTU-2, and RTU-3. | ||
| 12/11/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please resubmit along with the completed SIC. | ||
| 12/11/2025 | Masonry Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please resubmit along with the completed SIC. | ||
| 12/11/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | Please resubmit along with the completed SIC. | ||
| 12/11/2025 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | No SIC provided for review. | ||
| 12/10/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 12/15/2025 | Pima County Wastewater (Deferred Submittal) Express | REVIEW COMPLETED |