| 04/07/2026 | Site Zoning Standard | APPROVED | |||
| 04/20/2026 | Landfill Standard | NOT REQUIRED | The Landfill Ordinance applies to new or existing enclosed structures. | ||
| 04/06/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 04/03/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 04/20/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/10/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. Structural Calculations Required: Provide structural calculations for the proposed ballasted system demonstrating resistance to overturning/uplift and lateral sliding forces, in accordance with IBC Section 1605 and ASCE 7 (Chapter 29). Calculations shall be prepared, signed, and sealed by an Arizona-licensed design professional. 2. Sealed Plans: Ensure the submitted racking/roof plans are signed and sealed by the Arizona-licensed design engineer responsible for the design. (IBC Section 107.2.1) 3. Code Update – Structural Evaluation: Revise the existing roof structure evaluation to reflect compliance with the 2024 IBC, as amended by the City of Tucson, and ASCE 7-22. Clearly identify the applicable codes used in the analysis. (IBC Section 107.2.7 )https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/building-code/2024-international-building-code-amendments.pdf Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 04/06/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0326-00403 (275 N COMMERCE PARK LP TUCSON, AZ 85745) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Modifications to the listed service gear and bus-bar must be re-certified, by an independent and approved testing agency, per its original listing, NEC 110.3(A)-(C). See also NEC 110.21(A)(2) for additional marking requirements. You will need to provide the re-certification certificate prior to final inspections. 2. Reference sheets PV E1.2(Conductor & Conduit Schedule) and PV E2.1 (AC Conductor Schedule). a. Conductor Tag ‘B’ (PV E1.2) should be listed as two different rows (perhaps B1 & B2) to show the correct sizes for the outputs of DC combiner 3 (#6) and DC combiner 4(#4). This would be consistent with the DC3.* and DC4.* conductor sizing on PV E2.1. b. Rename the ‘AC Conductor Schedule’ that contains the DC circuits DC3.* and DC4.* to reflect that this is a DC circuit and not AC. c. Conductor Tag ‘C’ (PV E1.2) is missing the conductor sizing. Pease update to include the correct sized conductor. d. Conductor Tag ‘C’ (PV E1.2) is shown with type XLPE or NHH insulation type conductors, but Conductor Tag ‘AC1.3’ and ‘AC1.4’ (PV E2.1) shows insulation type THWN. Please correct and show consistent information between tables. |
||
| 04/14/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | -Provide smoke ventilation between arrays per 1205.3.3 (#3). john.vincent@tucsonaz.gov 5203495581 |
||
| 03/23/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |