Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0326-00364
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/04/2026 | Commercial Mechanical Standard | APPROVED | |||
| 05/04/2026 | Commercial Plumbing Standard | APPROVED | |||
| 05/04/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/04/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-0326-00364 – Commercial Addition/Alteration Location: 439 N 6TH AV Review Date: 5/4/2026 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-06 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage… Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-rete… Overall, for application submittal requirements, see Administrative Manual Section 2-06 Site Engineering: 1. Site Engineering will be unable to approve permit TC-COM-0326-00364 until the associated FPU TE-FPU-0426-00128 permit is approved. If you have any questions or concerns, please contact Joe Macaulay at: Joe.Macaulay@tucsonaz.gov |
||
| 04/16/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |