Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0326-00359
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/13/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/13/2026 Addressing Validation REQUIRES RESUBMIT If you have questions regarding this Addressing Review, please contact Maribel Arevalo at maribel.arevalo@tucsonaz.gov
Complete project address missing from site plan submitted. Please add complete address to site plan and resubmit.
Step-by-step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf
03/13/2026 Commercial Electrical Express REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0326-00359 (6924 E SPEEDWAY BL Unit:BLDG 1 UNIT 1 TUCSON, AZ 85710)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC).

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov


1. Provide an electrical riser diagram, NEC 230.9. Notate the grounding and bonding method, NEC 250.20(B), 250.24, 250.30(A)(4). Metallic gas lines must be bonded and not be used as the primary grounding method, NEC 250.50, 250.52(B)(1).
a. Show each meter and address/unit associated with each meter.
2. Provide Service Surge Protection per NEC 230.67.
03/13/2026 PDSD Application Completeness Express REVIEW COMPLETED