Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0326-00354
Parcel: 14139001A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0326-00354
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/25/2026 Commercial Electrical Standard APPROVED
04/02/2026 Site Zoning Standard APPROVED
03/19/2026 Outdoor Lighting Standard NOT REQUIRED No modifications to the outdoor lighting.
03/31/2026 Site Engineering Standard NOT REQUIRED
04/03/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/26/2026 Commercial Building Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0326-00354
ADDRESS/PARCEL: (9210 E VALENCIA RD TUCSON, AZ 85747)

Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed.

Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976.

COMMENTS:
1. BALLAST SYTEM USED
a. Ballast system required structural calculation conducted/generated by a State of Arizona licensed Structural Engineer.
b. Ensure the document is sealed/signed/dated by the structural engineer.
c. Submit the roof loading calculation.
d. Submit the Uplift calculation related to lateral forces such as the 115 mph 3 second gust.
2. Please resubmit.
04/03/2026 Fire New Construction Standard REVIEW COMPLETED
03/12/2026 PDSD Application Completeness Express REVIEW COMPLETED