Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0326-00307
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/11/2026 | Site Engineering | NOT REQUIRED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building | PENDING ASSIGNMENT | |||
| N/A | Commercial Mechanical | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing | PENDING ASSIGNMENT | |||
| N/A | Design Review | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction | PENDING ASSIGNMENT | |||
| N/A | Site Zoning | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD | PENDING ASSIGNMENT | |||
| 03/16/2026 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0326-00307 (410 N TOOLE AV Unit:UNIT 116 TUCSON, AZ 85705) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Clarify and correct the MCB size for Panel ‘D’. The 1 line diagram shows this panel with a 200A MCB, but the note under this same diagram shows a 125MCB. Also, the Panel Schedule for ‘D’ shows a 125A MCB. Finally, the load calculations for panel ‘D’ are greater than 125A. Please provide consistent information and notes. 2. Reference sheet E-3, Electrical Power & Systems. a. The laundry area has a circuit designation of 13,15 being used, but the panel schedule shows circuits 13,15 as spare. Clarify and correct. b. The Sauna area shows two NEMA 6-50R receptacles, but both show the same circuits 31,33 (Sauna Room Sauna) being used. The panel schedule shows a second circuit, 35,37 (Sauna Room Sauna). Should one of these receptacles be tied to the second available Sauna Room Sauna circuit? c. Show PNL ‘D’, on the Electrical Power & Systems plan with clear working space and no storage or items within the designated area, NEC 110.26(A). NEC 210(8): All 125-volt through 250-volt receptacles supplied by single-phase branch circuits rated 150 volts or less to ground, 50 amperes or less, and all receptacles supplied by three-phase branch circuits rated 150 volts or less to ground, 100 amperes or less, installed in the following locations shall be provided with GFCI protection: 3. Provide GFCI protection for all receptacles within the laundry area per NEC 210.8(B)(14). 4. Clarify if the sauna area is designated a wet or damp location and provide GFCI protection for all receptacles per NEC 210.8(B)(8). 5. Reference Sheet E-2, Panel Schedule ‘D2’. Clarify note under this panel schedule and show which circuits are to be placed in this panel. What does ‘REWIRE ALL salon SALON POWER TO THIS PANEL’ mean? |
||
| 03/05/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |