Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0326-00298
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/19/2026 | Site Zoning Standard | APPROVED | |||
| 05/01/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 05/19/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/14/2026 | Commercial Building Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0326-00298 ADDRESS/PARCEL: (5353 E 22ND ST Unit:BLDG 6 TUCSON, AZ 85711) TC-COM-0326-00298 (5353 E 22ND ST Unit:BLDG 6 TUCSON, AZ 85711) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976. COMMENTS: 1. PROPOSED FIXES a. Thank you for submitting photographs showing the damages and their locations, however these are not sufficient. b. Please submit detailed drawings illustrating the proposed fixes for the damages caused by the lateral impact. c. Please confirm any electrical affected by this impact. For example, the electrical receptacle show on the photograph. How it this going to be addressed. 2. Please resubmit. |
||
| 05/19/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 04/28/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |