Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0325-00553
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/13/2025 | Commercial Electrical Standard | APPROVED | |||
| 05/13/2025 | Outdoor Lighting Standard | APPROVED | |||
| 06/04/2025 | Site Engineering Standard | APPROVED | |||
| 05/30/2025 | Site Zoning Standard | APPROVED | |||
| 05/29/2025 | Water - PDSD Standard | APPROVED | |||
| 06/04/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/29/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. The kiosk does not qualify as an equipment building: it is not for electrical equipment and it has less than 7 Watts per square foot of electrical equipment (110 SF and only a 100 W service). Reference: Section C402.1.2, IECC 2018. [Initial comment: Show how the building envelope complies with the requirements of Section C402, IECC 2018. 2. Equipment buildings are only exempt from the building envelope requirements. Show that the specified AC unit complies with Section C403.3.2, IECC 2018. [Initial comment: Provide specifications for the “Pioneer Ductless” and show how it complies with the requirements of Section C403, IECC 2018.. |
||
| 05/29/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Comment not addressed. How does the downspout discharge enter into the sidewalk scupper? [Initial comment: Clarify how the storm water from the primary roof drain is routed to the sidewalk scupper.] | ||
| 05/08/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |