Permit Number: TC-COM-0325-00553
Parcel: 13701007V

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0325-00553
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/16/2025 Commercial Building Standard APPROVED
04/17/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/28/2025 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0325-00553 (5670 S NOGALES HY TUCSON, AZ 85706)

Sheet C1.0 is marked “Preliminary, Not for Construction”. Please provided a complete plan set Sealed and ready for construction.
04/16/2025 Commercial Mechanical Standard REQUIRES RESUBMIT 1. Provide construction documents that are complete and clearly indicate the extent of the proposed work (i.e. remove the “Preliminary, not for Construction” label from the drawings.). Reference: Section 107.2.1, IBC 2018.
2. Show how the building envelope complies with the requirements of Section C402, IECC 2018.
3. Provide specifications for the “Pioneer Ductless” and show how it complies with the requirements of Section C403, IECC 2018.
4. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson.
04/16/2025 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Provide construction documents that are complete and clearly indicate the extent of the proposed work (i.e. remove the “Preliminary, not for Construction” label from the drawings.). Reference: Section 107.2.1, IBC 2018.
2. Show how the water service is introduced to the kiosk. Include the required valves and backflow protection. Reference: Sections 604.1, 606.1(2), 606.2, and Section 608.1, IPC 2018.
3. Provide dimensions for the roof drains and the storm water conductors. Detail the terminations for the primary and secondary roof drains. Reference: Section 107.2.1, IBC 2018.
4. Clarify how the storm water from the primary roof drain is routed to the sidewalk scupper.
03/26/2025 Outdoor Lighting Standard REQUIRES RESUBMIT Outdoor Lighting Review TC-COM-0325-00553 (5670 S NOGALES HY TUCSON, AZ 85706)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).

https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Outdoor Lighting Review:

1. Provide an outdoor lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your table and use the same number on your site plan
2. Full cut-off lighting, installed under canopies, roof overhangs or eaves, are exempt from Lumen Calculation.
3. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 3.1.2. Include all exterior fixtures on the property in the calculations. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. Show lamps with a maximum of 3500K color temperature, OLC 402.1.
4. Show compliance with total outdoor light output per 2012 City of Tucson/Pima County Outdoor Lighting Code section 401.2. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. 4. E1.1 – Lighting Code section 104.2.2.
5. Submit catalogue or specification sheets of all proposed new outdoor lighting fixtures illustrating the type of fixture, color temperature, lumens rating and whether full cut-off or unshielded.

6. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2.

7. Specify any exceptions used.

8. Provide Curfew lighting controls If applicable Per section 403.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
04/17/2025 Site Engineering Standard REQUIRES RESUBMIT TC-COM-0325-00553
5670 S NOGALES HY

Site engineering comments are as follows:
1. Please see Zoning comment regarding the need for a Development Package per Unified Development Code Article 3.3.3.G.2.c.
2. Ensure that the DP complies with the format set forth in Administrative Manual 2-06.2.
Ryan Insalaco – ryan.insalaco@tucsonaz.gov
04/15/2025 Site Zoning Standard REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: TC-COM-0325-00553
5670 S. Nogales Hwy. - C-2
General Merchandise Sales (1st Review)

TRANSMITTAL DATE: ‎April 15, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the C-2 zone (UDC 4.7.21). General Merchandise Sales is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standard 4.9.9.B.1.

1. Based on aerial photos there are numerous storage containers on site. Zoning was not able to find approved permit documents for these containers. Either 1) provide an approved site/development package showing these containers, 2) submit a development package meeting the requirements of AM Section 20-6 for review, or 3) provide photos that clearly show that all unpermitted structures have been removed from site.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
04/16/2025 Water - PDSD Standard REQUIRES RESUBMIT 1. Provide construction documents that are complete and clearly indicate the extent of the proposed work (i.e. remove the “Preliminary, not for Construction” label from the drawings.). Reference: Section 107.2.1, IBC 2018.
2. Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018.
03/27/2025 Fire New Construction Standard REVIEW COMPLETED
03/24/2025 PDSD Application Completeness Express REVIEW COMPLETED